Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Permit Declaration
1. Identification Details: Full legal name, address, and registration details of the declaring party
2. Permit Reference: Specific reference to the type of permit and any relevant application numbers or identifiers
3. Declaration Statement: Formal statement declaring compliance with permit requirements and conditions
4. Property/Activity Details: Detailed description of the property, activity, or matter subject to the permit
5. Compliance Commitments: Specific statements regarding how compliance with permit conditions will be maintained
6. Duration and Validity: Timeline and validity period of the declaration and associated permit
7. Verification: Confirmation of the truth and accuracy of all statements made in the declaration
8. Signature Block: Space for official signature, date, and company stamp if applicable
1. Environmental Impact Statement: Required when the permit relates to activities with potential environmental impacts
2. Safety Measures: Needed for permits involving hazardous materials or dangerous activities
3. Public Consultation Results: Required when the permit process included mandatory public consultation
4. Previous Permit History: Relevant for renewals or modifications of existing permits
5. Third Party Agreements: Required when the permit involves agreements with other parties or stakeholders
1. Technical Specifications: Detailed technical information supporting the permit declaration
2. Site Plans: Maps, drawings, or plans relevant to the permit
3. Compliance Documentation: Certificates, test results, or other evidence of compliance with requirements
4. Authorization Documents: Power of attorney or other authorization documents if signed by a representative
5. Supporting Calculations: Any relevant calculations or technical assessments required for the permit
Authors
Authority
Competent Body
Compliance Period
Declaring Party
Effective Date
Environmental Impact
Facility
Incident
Installation
Material Change
Monitoring Requirements
Non-compliance
Permit
Permit Conditions
Permitted Activities
Premises
Relevant Standards
Responsible Person
Site
Technical Documentation
Technical Specifications
Validity Period
Authority Recognition
Permit Scope
Compliance Obligations
Technical Requirements
Environmental Protection
Health and Safety
Monitoring and Reporting
Record Keeping
Site Access
Emergency Procedures
Personnel Qualifications
Change Management
Duration and Renewal
Verification and Certification
Non-compliance Reporting
Amendments and Modifications
Regulatory Notifications
Insurance Requirements
Representations and Warranties
Find the exact document you need
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.