Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Certificate Of Satisfactory Completion
"I need a Certificate of Satisfactory Completion for a 20-story commercial building project in Singapore's Central Business District, which includes confirmation of Green Mark Platinum certification compliance and completion of all smart building systems integration by March 2025."
1. Project Identification: Details of the project including contract number, location, and scope of works
2. Completion Confirmation: Formal statement confirming that all works have been completed satisfactorily according to contract specifications
3. Completion Date: Official date of completion of all works
4. Quality Compliance Statement: Confirmation of compliance with required standards, specifications, and building codes
5. Authorization: Signatures and details of authorizing parties including contractors, architects, and relevant authorities
1. Defects List: List of minor defects to be rectified during the defect liability period, if any exist
2. Performance Metrics: Specific performance achievements and KPIs met during construction for complex projects
3. Safety Compliance: Specific safety standards met during construction for projects with special safety requirements
4. Outstanding Works: List of any minor outstanding works that do not affect the substantial completion of the project
1. Final Inspection Reports: Detailed reports from final inspections conducted by relevant authorities
2. Test Certificates: Certificates for various tests conducted on installations and systems
3. As-Built Drawings: Final drawings showing actual construction details and modifications
4. Warranties and Guarantees: List of warranties and guarantees for various components and systems
5. Statutory Compliance Certificates: Certificates showing compliance with relevant building codes and regulations
Authors
Works
Contract
Completion Date
Defects Liability Period
Principal Contract
Contract Documents
Specifications
Approved Plans
Quality Standards
Qualified Person
Project Site
Practical Completion
As-Built Drawings
Test Certificates
Building Authority
Building Control Act
Construction Standards
Project Owner
Main Contractor
Contract Administrator
Substantial Completion
Final Inspection
Outstanding Works
Permitted Variations
Scope of Works
Completion Confirmation
Quality Compliance
Inspection Findings
Outstanding Defects
Warranties
Testing Results
Health and Safety Compliance
Environmental Compliance
Regulatory Compliance
Technical Standards Compliance
Quality Assurance
Document Handover
As-Built Documentation
Certification Authority
Date of Completion
Defects Liability Period
Payment Status
Insurance Status
Find the exact document you need
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.