Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Rapid Risk Assessment
1. 1. Assessment Information: Basic information including date, location, assessor details, and scope of assessment
2. 2. Risk Identification: List and description of identified potential hazards and threats
3. 3. Current Control Measures: Documentation of existing control measures and safety procedures
4. 4. Risk Analysis: Assessment of likelihood and potential impact of each identified risk
5. 5. Risk Evaluation: Prioritization of risks based on their severity and probability
6. 6. Immediate Actions Required: Urgent control measures or actions that need to be implemented
7. 7. Recommendations: Proposed additional control measures and improvements
8. 8. Review and Monitoring: Timeline and process for reviewing the assessment and monitoring implementation of actions
1. Stakeholder Consultation: Details of consultation with relevant stakeholders - include when multiple parties are affected by the risks
2. Environmental Impact Assessment: Quick assessment of environmental implications - include when environmental risks are identified
3. Business Continuity Considerations: Impact on business operations - include for organizational risk assessments
4. Cost-Benefit Analysis: Basic analysis of control measure costs versus benefits - include when significant investments are required
5. Compliance Review: Review against specific regulatory requirements - include for heavily regulated industries
1. Appendix A: Risk Assessment Matrix: Standard risk assessment matrix used for evaluation
2. Appendix B: Photographic Evidence: Relevant photographs documenting identified hazards or risks
3. Appendix C: Control Measure Checklist: Detailed checklist of required control measures
4. Appendix D: Action Plan Template: Template for documenting and tracking required actions
5. Appendix E: Reference Documents: List of relevant standards, regulations, and guidelines consulted
6. Schedule 1: Risk Register: Detailed register of all identified risks and their evaluation
7. Schedule 2: Incident Response Procedures: Quick reference procedures for responding to identified risks
Authors
Control Measure
Critical Risk
Emergency Response
Hazard
Immediate Action
Impact
Incident
Likelihood
Major Accident
Mitigation Measure
Near Miss
Preventive Action
Probability
Residual Risk
Risk
Risk Assessment
Risk Level
Risk Matrix
Risk Owner
Risk Rating
Safety Representative
Severity
Significant Change
Stakeholder
Workplace
Work Process
Safe Operating Procedure
Affected Party
Competent Person
Control System
Dangerous Occurrence
Environmental Impact
Hazardous Condition
Implementation Date
Review Period
Safety System
Target Date
Vulnerability
Risk Assessment Methodology
Control Measures
Emergency Response
Documentation Requirements
Responsibilities and Authorities
Review and Monitoring
Reporting Requirements
Compliance Obligations
Implementation Timeline
Action Planning
Safety Procedures
Environmental Considerations
Training Requirements
Communication Protocols
Record Keeping
Incident Response
Evaluation Criteria
Assessment Scope
Stakeholder Consultation
Quality Control
Continuous Improvement
Regulatory Compliance
Risk Mitigation
Find the exact document you need
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.