Risk Assessment And Method Statement Generator for Australia

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Risk Assessment And Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Risk Assessment And Method Statement Template Free

"I need a Risk Assessment And Method Statement Template Free for a construction project in Sydney, commencing March 2025, focusing on working at heights and crane operations, compliant with Australian WHS regulations and specific NSW construction safety requirements."

Document background
The Risk Assessment And Method Statement Template Free is a fundamental workplace safety document designed for use across Australian jurisdictions. It serves as an essential tool for organizations to comply with Work Health and Safety (WHS) legislation and demonstrate due diligence in managing workplace risks. This template should be used before commencing any significant work activity or project, particularly those involving high-risk operations. It combines two crucial elements: a systematic risk assessment process and a detailed method statement outlining safe work procedures. The document ensures compliance with Australian WHS regulations, Safe Work Australia guidelines, and relevant industry standards, while providing a practical framework for hazard identification, risk evaluation, and control measure implementation. It is particularly valuable for organizations seeking to establish consistent safety protocols and demonstrate their commitment to workplace safety obligations.
Suggested Sections

1. Document Control: Details of document version, review dates, and approval status

2. Project/Task Information: Basic details including project name, location, scope of works, and duration

3. Responsible Persons: Names and contact details of key personnel including site supervisor, safety officer, and emergency contacts

4. Scope of Assessment: Detailed description of the work activities being assessed and their boundaries

5. Risk Assessment Matrix: Standard risk evaluation matrix showing likelihood, consequence, and risk ratings

6. Hazard Identification: Comprehensive list of potential hazards associated with the work activities

7. Risk Assessment: Evaluation of identified risks using the risk matrix, including initial risk ratings

8. Control Measures: Detailed description of control measures to be implemented following the hierarchy of controls

9. Residual Risk Assessment: Re-evaluation of risks after control measures are implemented

10. Method Statement: Step-by-step description of how the work will be carried out safely

11. Training Requirements: List of required qualifications, certifications, and training for personnel

12. PPE Requirements: Detailed list of required Personal Protective Equipment

13. Emergency Procedures: Specific emergency response procedures and evacuation plans

14. Review and Monitoring: Process for monitoring control measures and reviewing the RAMS

Optional Sections

1. Environmental Impact Assessment: Assessment of environmental risks and controls, required for works with potential environmental impact

2. Noise Assessment: Specific section for works involving high noise levels or in noise-sensitive areas

3. Traffic Management: Required for works affecting public roads or involving vehicle movements

4. Confined Space Assessment: Specific requirements for work in confined spaces

5. Working at Heights: Additional controls and procedures for elevated work

6. Permit to Work Requirements: Details of required permits for high-risk activities

7. Stakeholder Consultation: Documentation of consultation with affected parties, required for works affecting multiple stakeholders

8. Chemical Risk Assessment: Detailed assessment for works involving hazardous substances

9. Plant and Equipment: Specific section for works involving heavy machinery or specialized equipment

Suggested Schedules

1. Risk Assessment Matrix Guide: Detailed guidance on using the risk matrix and determining risk levels

2. Site Layout Plans: Drawings showing work areas, access points, and emergency facilities

3. Safe Work Method Diagrams: Visual representations of safe working methods

4. Equipment Certificates: Copies of relevant equipment inspection certificates and calibration records

5. Safety Data Sheets: SDS for any hazardous substances being used

6. Training Records Template: Template for recording worker training and competency

7. Incident Report Form: Standard form for reporting accidents and incidents

8. Daily Inspection Checklist: Template for daily safety inspections

9. Emergency Contact List: Comprehensive list of emergency contacts and procedures

10. Toolbox Talk Templates: Templates for conducting safety briefings and toolbox talks

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions
Clauses
Relevant Industries

Construction

Mining

Manufacturing

Oil and Gas

Infrastructure

Transport and Logistics

Utilities

Healthcare

Agriculture

Warehousing

Chemical Processing

Waste Management

Telecommunications

Renewable Energy

Marine Operations

Relevant Teams

Health and Safety

Operations

Project Management

Quality Assurance

Risk Management

Compliance

Engineering

Field Operations

Maintenance

Environmental

Production

Emergency Response

Training and Development

Relevant Roles

Health and Safety Manager

Project Manager

Site Supervisor

Risk Assessment Officer

Safety Coordinator

Operations Manager

Construction Manager

Quality Assurance Manager

Compliance Officer

Environmental Officer

Work Health and Safety Officer

Production Supervisor

Maintenance Manager

Engineering Manager

Field Operations Supervisor

Industries
Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Risk Assessment Aged Care

An Australian-compliant Risk Assessment Template for aged care facilities, designed to identify and manage risks while meeting regulatory requirements.

find out more

Home Oxygen Safety Risk Assessment Form

An Australian-compliant safety assessment form for evaluating risks and documenting safety measures for patients receiving home oxygen therapy.

find out more

Pregnant Risk Assessment

An Australian-compliant template for assessing and managing workplace risks for pregnant employees, aligned with WHS legislation.

find out more

Worksite Assessment

An Australian-compliant template for conducting and documenting systematic workplace safety assessments under WHS legislation.

find out more

Site Visit Risk Assessment

An Australian-compliant template for conducting comprehensive site visit risk assessments in accordance with WHS legislation and industry standards.

find out more

Risk Self Assessment

An Australian-compliant Risk Self Assessment Template for systematic identification and management of organizational risks, aligned with WHS legislation and ISO 31000 guidelines.

find out more

Risk Assessment Social Care

An Australian-compliant Risk Assessment Template for social care providers, enabling systematic risk identification and management while meeting regulatory requirements.

find out more

Risk Assessment Log

An Australian-compliant Risk Assessment Log Template for systematic identification, evaluation, and management of workplace risks.

find out more

Risk And Control Assessment

An Australian-compliant template for systematic risk and control assessment, aligned with local regulatory requirements and corporate governance standards.

find out more

Program Risk Assessment

An Australian-compliant template for systematic program risk assessment, incorporating regulatory requirements and best practices for comprehensive risk management.

find out more

Pharmacy Risk Assessment

An Australian-compliant risk assessment template for pharmacies, covering operational, clinical, and safety risks under federal and state regulations.

find out more

Personal Training Risk Assessment

An Australian-compliant risk assessment template for personal training services, aligned with national Work Health and Safety legislation and fitness industry standards.

find out more

Organisational Risk Assessment

An Australian-compliant template for conducting comprehensive organizational risk assessments, aligned with national legislation and standards.

find out more

Makeup Artist Risk Assessment

An Australian-compliant risk assessment template for makeup artists, covering comprehensive safety and hygiene protocols in accordance with WHS regulations.

find out more

Gate Risk Assessment Form

An Australian-compliant safety assessment document for evaluating and managing risks associated with gate installations and operations in workplace settings.

find out more

Forestry Risk Assessment

An Australian-compliant risk assessment template for forestry operations, covering environmental, safety, and operational risks under federal and state legislation.

find out more

Electronic Signature Risk Assessment

A risk assessment framework for electronic signature implementation in compliance with Australian electronic transaction laws and regulations.

find out more

Electrical Equipment Risk Assessment

An Australian-compliant template for conducting risk assessments of electrical equipment, aligned with WHS and Electrical Safety regulations.

find out more

Dance Risk Assessment

An Australian-compliant risk assessment template for dance activities, aligned with WHS legislation and industry standards.

find out more

Care Plan Risk Assessment

An Australian-compliant template for healthcare providers to assess and document client care risks, ensuring comprehensive risk management and regulatory compliance.

find out more

Risk Assessment Childcare

An Australian-compliant risk assessment template for childcare facilities, designed to identify and manage risks while meeting national regulatory requirements.

find out more

Smoking Risk Assessment

An Australian-compliant template for assessing and managing workplace smoking-related risks, aligned with federal and state WHS requirements.

find out more

Service User Risk Assessment

An Australian-compliant template for assessing and managing risks associated with individual service users in healthcare and social service settings.

find out more

Service Provider Risk Assessment

An Australian-compliant template for systematic assessment of service provider risks, incorporating local regulatory requirements and risk management frameworks.

find out more

Job Hazard Assessment Form

An Australian-compliant workplace hazard assessment template for systematic identification and control of workplace safety risks under WHS legislation.

find out more

Ppe Risk Assessment

An Australian-compliant risk assessment document that evaluates workplace hazards and establishes comprehensive PPE requirements and protocols.

find out more

Participant Risk Assessment

An Australian-compliant template for assessing and documenting participant-related risks in service delivery contexts.

find out more

Machine Guarding Assessment

An Australian-compliant template for assessing machine guarding systems and safety controls in accordance with WHS legislation and relevant standards.

find out more

New And Expectant Mothers Risk Assessment

An Australian workplace risk assessment template for protecting new and expectant mothers, ensuring compliance with WHS legislation and anti-discrimination laws.

find out more

Bar Risk Assessment

An Australian-compliant risk assessment template for bar operations, covering all essential safety and operational risk aspects under federal and state regulations.

find out more

Threat Vulnerability Assessment

An Australian-compliant template for conducting comprehensive threat and vulnerability assessments of organizational information systems and infrastructure.

find out more

Machine Guarding Risk Assessment

An Australian-compliant template for assessing machine guarding risks and safety requirements in accordance with WHS regulations and AS 4024 standards.

find out more

Field Level Hazard Assessment

An Australian-compliant template for conducting and documenting systematic hazard assessments in field-based work environments.

find out more

Home Visit Risk Assessment

An Australian-compliant risk assessment template for healthcare and community service providers conducting home visits, ensuring WHS compliance and safe service delivery.

find out more

Domiciliary Care Risk Assessment

An Australian-compliant template for assessing and managing risks in home care service delivery.

find out more

Pre Job Hazard Assessment

An Australian-compliant Pre Job Hazard Assessment Template for systematic identification and control of workplace hazards before task commencement.

find out more

Formal Hazard Assessment

An Australian-compliant template for systematic workplace hazard assessment and risk control documentation.

find out more

Application Security Risk Assessment

An Australian-compliant template for conducting comprehensive application security risk assessments, aligned with local privacy and data protection requirements.

find out more

Risk Assessment Security

An Australian-compliant security risk assessment template providing a structured framework for identifying and managing security risks across organizations.

find out more

High Level Risk Assessment

An Australian-compliant template for conducting comprehensive high-level risk assessments across various business operations and projects.

find out more

Yard Risk Assessment

An Australian-compliant template for assessing and managing risks in workplace yard operations, aligned with WHS legislation.

find out more

Occupied Building Risk Assessment

An Australian-compliant template for conducting comprehensive risk assessments of occupied buildings, aligned with WHS legislation and safety standards.

find out more

Display Screen Assessment

An Australian-compliant template for assessing display screen equipment workstations and associated risks under WHS regulations.

find out more

Desk Risk Assessment

An Australian-compliant template for assessing and managing risks associated with desk-based workstations, aligned with local WHS legislation.

find out more

Asset Management Risk Assessment

An Australian-compliant template for conducting comprehensive asset risk assessments, aligned with federal and state regulatory requirements.

find out more

Pre Construction Risk Assessment

An Australian-compliant template for conducting comprehensive pre-construction risk assessments, aligned with WHS legislation and construction industry standards.

find out more

Catering Risk Assessment

An Australian-compliant risk assessment template for catering operations, addressing food safety and operational risks under national and state regulations.

find out more

Working At Height Risk Assessment

An Australian-compliant working at height risk assessment template aligned with WHS legislation and Australian Standards for comprehensive height safety management.

find out more

Electrical Risk Assessment

An Australian-compliant template for conducting comprehensive electrical risk assessments in accordance with WHS regulations and electrical safety standards.

find out more

Hazard Vulnerability Assessment

An Australian-compliant template for conducting comprehensive hazard vulnerability assessments, aligned with federal and state WHS regulations and risk management standards.

find out more

Manual Handling Risk Assessment

An Australian-compliant template for assessing and managing manual handling risks in the workplace, aligned with WHS legislation.

find out more

Construction Risk Assessment

An Australian-compliant template for conducting comprehensive risk assessments in construction projects, aligned with WHS regulations and industry standards.

find out more

Electrician Electrical Risk Assessment

An Australian-compliant electrical risk assessment template for documenting and managing electrical work hazards and safety measures.

find out more

Simple Risk Assessment

An Australian-compliant workplace risk assessment template for systematic hazard identification and risk control, aligned with WHS legislation and standards.

find out more

Occupational Therapy Risk Assessment

An Australian-compliant risk assessment template for occupational therapists to evaluate and document potential risks in therapy settings.

find out more

Psychology Risk Assessment

An Australian-compliant template for conducting and documenting psychological risk assessments, suitable for healthcare and organizational settings.

find out more

Workplace Violence Risk Assessment

An Australian-compliant template for assessing and managing workplace violence risks, aligned with WHS legislation requirements.

find out more

Third Party Risk Assessment

An Australian-compliant template for conducting comprehensive third-party risk assessments, aligned with local regulatory requirements and risk management frameworks.

find out more

Workplace Violence And Harassment Risk Assessment

An Australian-compliant template for assessing and managing workplace violence and harassment risks under WHS legislation.

find out more

System Risk Assessment

An Australian-compliant template for conducting comprehensive system risk assessments, aligned with local regulations and standards.

find out more

Travel Risk Assessment

An Australian-compliant template for assessing and managing business travel risks, ensuring organizational duty of care and WHS compliance.

find out more

Stress Risk Assessment

An Australian-compliant template for conducting workplace stress risk assessments and managing psychological hazards under WHS legislation.

find out more

Step Ladder Risk Assessment

An Australian-compliant template for assessing and managing risks associated with step ladder use in workplaces, aligned with WHS legislation and Australian Standards.

find out more

Shop Risk Assessment

An Australian-compliant risk assessment template for retail environments, addressing workplace safety hazards and control measures under WHS regulations.

find out more

Risk Benefit Assessment

An Australian-compliant template for conducting structured risk-benefit assessments across various business operations and projects.

find out more

Risk Assessment And Method Statement

An Australian-compliant RAMS template for systematic risk assessment and safe work method documentation, aligned with WHS legislation.

find out more

Pest Risk Assessment

An Australian-compliant template for conducting comprehensive pest risk assessments, incorporating federal and state biosecurity requirements.

find out more

Outdoor Risk Assessment

Australian-compliant outdoor risk assessment template for systematic evaluation and management of risks in outdoor activities and operations.

find out more

Infection Control Risk Assessment

An Australian-compliant template for conducting and documenting infection control risk assessments in healthcare and related facilities, aligned with national healthcare standards and WHS regulations.

find out more

Hot Work Risk Assessment

An Australian-compliant risk assessment template for managing safety hazards associated with hot work activities including welding, cutting, and grinding operations.

find out more

Legal Risk Assessment

An Australian-jurisdiction template for systematic legal risk assessment and management, aligned with federal and state legislative requirements.

find out more

Functional Risk Assessment

An Australian WHS-compliant Functional Risk Assessment Template for systematic workplace risk identification and management.

find out more

Forklift Risk Assessment

An Australian-compliant template for assessing and managing risks associated with forklift operations in workplace environments.

find out more

Food Safety Risk Assessment

An Australian-compliant Food Safety Risk Assessment Template for systematic evaluation and management of food safety hazards in accordance with HACCP principles and local regulations.

find out more

Food Defense Threat Assessment

An Australian-compliant template for assessing and documenting food defense threats in accordance with FSANZ requirements and TACCP principles.

find out more

First Aid Risk Assessment

An Australian-compliant template for assessing workplace first aid requirements and risks under WHS legislation.

find out more

Finance Risk Assessment

An Australian-compliant template for systematic financial risk assessment, aligned with APRA and ASIC requirements for financial institutions.

find out more

Anti Bribery And Corruption Risk Assessment

An Australian-compliant template for systematically assessing and documenting organizational bribery and corruption risks, aligned with local and international anti-corruption legislation.

find out more

Service User Risk Assessment Form

An Australian-compliant form for assessing and documenting service delivery risks to individual clients, meeting federal and state healthcare and safety regulations.

find out more

Young Person Risk Assessment Form

An Australian-compliant risk assessment form for evaluating and documenting potential risks associated with young people, including identification, evaluation, and intervention recommendations.

find out more

Job Site Hazard Assessment Form

An Australian-compliant workplace safety document for systematically identifying and controlling site-specific hazards before work commencement.

find out more

Task Risk Assessment Form

An Australian-compliant workplace safety document for systematically assessing and controlling risks associated with specific tasks, aligned with WHS legislation.

find out more

Eye Wash Station Risk Assessment Form

An Australian-compliant risk assessment form for evaluating eye wash station requirements, placement, and maintenance in workplaces where eye hazards exist.

find out more

Workplace Hazard Assessment Form

An Australian-compliant workplace safety document for identifying, assessing, and controlling workplace hazards under WHS legislation.

find out more

Pre Task Risk Assessment Form

An Australian-compliant workplace safety document used to assess and control risks before commencing specific tasks, aligned with WHS legislation.

find out more

Operational Risk Management Form

An Australian-compliant workplace risk assessment and management document for systematically identifying, evaluating, and controlling operational hazards.

find out more

Health Hazard Evaluation Form

An Australian-compliant workplace document for systematic identification, assessment, and control of health hazards, aligned with WHS legislation.

find out more

Filming Risk Assessment Form

An Australian-compliant risk assessment document for identifying and managing safety hazards in film production activities.

find out more

Environmental Risk Assessment Form

An Australian-compliant document for assessing and managing environmental risks in accordance with federal and state environmental protection laws.

find out more

Cyber Security Assessment Form

An Australian-compliant cybersecurity assessment form for evaluating organizational security controls, risks, and regulatory compliance status.

find out more

Job Safety Assessment Form

An Australian workplace safety document for systematically assessing and controlling risks associated with specific work tasks, compliant with WHS legislation.

find out more

Health Risk Assessment Form

An Australian-compliant workplace health risk assessment form for evaluating and documenting individual health status and occupational health risks.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: https://www.genieai.co/our-research
Oops! Something went wrong while submitting the form.

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our Trust Centre for more details and real-time security updates.