Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Painting Risk Assessment And Method Statement
"I need a Painting Risk Assessment And Method Statement for an exterior painting project on a three-story commercial building in London, with specific focus on working at height and environmental protection measures due to its location near a protected waterway."
1. Project Information: Details of the project, location, scope of work, and key contacts
2. Risk Assessment: Comprehensive identification and evaluation of potential hazards and risks associated with the painting work
3. Control Measures: Detailed steps and procedures to mitigate identified risks, including engineering controls and administrative controls
4. Method Statement: Step-by-step procedure for carrying out the painting work safely, including sequence of operations
5. PPE Requirements: Detailed list of required personal protective equipment and when/how to use them
1. Working at Height Procedures: Required when painting involves elevated work using ladders, scaffolding, or platforms
2. Environmental Considerations: Include when work could impact the environment through waste, emissions, or drainage
3. Confined Space Procedures: Required when painting in enclosed or restricted spaces with limited access/egress
1. COSHH Data Sheets: Safety data sheets for all paints, solvents, and chemicals used in the work
2. Equipment Certificates: Certification and inspection records for access equipment, tools, and machinery
3. Training Records: Documentation of worker qualifications, certifications, and relevant training
4. Emergency Procedures: Detailed site-specific emergency response plans and contact information
Authors
Risk Assessment
Method Statement
Hazard
Risk
Control Measure
COSHH
PPE
Competent Person
Work at Height
Manual Handling
Principal Contractor
Client
Site Manager
Safety Data Sheet (SDS)
Safe Working Load
Access Equipment
Emergency Procedures
Confined Space
Hot Work
Permit to Work
Working Platform
Fall Protection
Near Miss
Task Lighting
Ventilation
Plant and Equipment
Scaffold
Working Area
Site Rules
Scope of Work
Hazard Identification
Risk Evaluation
Control Measures
Safety Procedures
Emergency Procedures
PPE Requirements
Equipment Requirements
Material Handling
COSHH Assessment
Working at Height
Manual Handling
First Aid
Accident Reporting
Environmental Protection
Waste Management
Site Access
Training Requirements
Supervision
Quality Control
Communication Procedures
Monitoring and Review
Permit Requirements
Legal Compliance
Find the exact document you need
Risk Assessment Army Form
A standardized military risk assessment document used in England and Wales to evaluate and control operational hazards in accordance with UK legislation.
Wheelchair Risk Assessment Form
A UK-compliant risk assessment form for evaluating wheelchair safety and usage requirements under English and Welsh law.
Visitor Risk Assessment Form
A legally mandated form under English and Welsh law for assessing and managing risks to visitors on organizational premises.
Lockout Tagout Risk Assessment Form
A mandatory safety document under England and Wales law for assessing and controlling risks associated with machinery maintenance and servicing.
Site Hazard Assessment Form
A legally mandated document under English and Welsh law for identifying and evaluating workplace hazards and safety risks.
Jobsite Hazard Assessment Form
A legally required safety assessment document under English and Welsh law for identifying and managing workplace hazards.
Life Safety Risk Assessment Form
A mandatory safety evaluation document under English and Welsh law that assesses and documents life safety risks and control measures in premises.
General Statement Of Policy Fire Risk Assessment
A mandatory fire safety policy document under English and Welsh law that outlines an organization's fire risk assessment and management approach.
Work Related Stress Risk Assessment Form
A legally required document under English and Welsh law for identifying and managing workplace stress risks, following HSE Management Standards.
Method Statement And Risk Assessment For Excavation
A legally required document under English and Welsh law that details safety procedures and risk mitigation measures for excavation works.
Manual Lifting Risk Assessment
A legally required document under English and Welsh law that assesses and manages risks associated with manual handling operations in the workplace.
Risk Assessment And Control Form
A legally mandated document under English and Welsh law for evaluating workplace hazards and establishing safety control measures.
Respiratory Hazard Assessment Form
A mandatory health and safety document under English and Welsh law for assessing and controlling workplace respiratory hazards.
Eye Wash Station Risk Assessment Form
A legal compliance document under English and Welsh law for assessing risks and control measures related to workplace eye wash stations.
Pre Task Risk Assessment Form
A legally required safety document under English and Welsh law for identifying and controlling workplace risks before beginning potentially hazardous tasks.
Initial Project Risk Assessment
A legally compliant document under English and Welsh law that identifies and evaluates initial project risks and establishes preliminary risk management strategies.
Corruption Risk Assessment And Mitigation Plan
An England and Wales law-governed document that assesses corruption risks and establishes mitigation strategies in compliance with UK anti-corruption legislation.
Executive Summary For Risk Assessment
A legally compliant summary document under English and Welsh law that outlines key organizational risks and mitigation strategies.
Daily Task Risk Assessment
A legally required document under England and Wales law that assesses and manages daily workplace task risks and safety measures.
Evaluation Of Risk Management Plan
An evaluation document under English and Welsh law that assesses and provides recommendations on an organization's risk management plan.
Fire And Life Safety Assessment Report
A technical assessment document evaluating property fire safety compliance and providing recommendations under English and Welsh law.
Site Safety Assessment Form
A legally required safety evaluation document under English and Welsh law that identifies and addresses workplace hazards and risks.
Internal Audit Plan Risk Assessment
A risk-based internal audit planning document under English and Welsh law that evaluates and prioritizes organizational risks to guide audit activities.
Building Risk Assessment Report
A legally-required document under English and Welsh law that assesses and documents building-related risks and safety measures.
Pre Task Risk Assessment
A legally required safety assessment document under English and Welsh law that identifies and mitigates risks before beginning specific tasks.
Manual Task Risk Assessment
A legally required document under English and Welsh law for assessing and managing risks associated with manual handling tasks in the workplace.
IT Security Risk Assessment Report
A formal evaluation of information security risks and recommendations, compliant with English and Welsh law and UK data protection regulations.
Health And Safety Policy Risk Assessment
A legally required document under English and Welsh law that identifies and evaluates workplace safety risks and establishes control measures.
Fire Risk Assessment Plan
A legally required fire safety document under English and Welsh law that assesses fire risks and outlines safety measures for premises.
Health Hazard Evaluation Form
A legally-compliant document under English and Welsh law for evaluating and documenting workplace health hazards and their control measures.
Cyber Security Assessment Form
A standardized form for evaluating organizational cybersecurity compliance and risks under English and Welsh law.
Task Specific Risk Assessment
A legally required document under English and Welsh law that evaluates and manages risks associated with specific workplace tasks.
Ppe Hazard Assessment Form
A legally mandated form under English and Welsh law for evaluating workplace hazards and determining appropriate PPE requirements.
Activity Based Risk Assessment Form
A statutory document under English and Welsh law for identifying and managing activity-specific workplace risks and control measures.
Risk Assessment Plan
A legally required document under English and Welsh law that identifies and manages workplace safety risks and hazards.
Audit Plan Risk Assessment
A formal risk assessment document for audit planning, compliant with English and Welsh law and UK auditing standards.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.