Site Specific Risk Assessment And Method Statement Template for Qatar

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Site Specific Risk Assessment And Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Site Specific Risk Assessment And Method Statement

"I need a Site Specific Risk Assessment and Method Statement for a high-rise construction project in Doha's West Bay area, specifically for facade installation work at heights above 40 meters, scheduled to commence in March 2025."

Document background
The Site Specific Risk Assessment And Method Statement (RAMS) is a crucial document required for construction and industrial projects in Qatar, mandated by local workplace safety regulations and international best practices. It serves as a comprehensive safety planning tool that combines systematic risk evaluation with detailed work procedures. The document must comply with Qatar's Labor Law No. 14 of 2004, Resolution No. 20 of 2021 on Occupational Safety and Health Requirements, and other relevant local regulations. It is required before commencing any significant construction or industrial activity and must be regularly updated to reflect changing site conditions or work phases. The RAMS includes detailed hazard identification, risk evaluation, control measures, step-by-step work procedures, resource requirements, and emergency response protocols, all tailored to Qatar's specific environmental and regulatory context.
Suggested Sections

1. Document Control: Document revision history, distribution list, and approval signatures

2. Project Information: Project details, location, scope of works, and key stakeholders

3. Site Description: Detailed description of the work site, access/egress points, and surrounding environment

4. Risk Assessment: Identification and evaluation of all potential hazards, risk ratings, and control measures

5. Method Statement: Step-by-step description of work activities, sequence, and safety controls

6. Resource Requirements: Personnel, equipment, materials, and PPE required for the work

7. Training Requirements: Required certifications, qualifications, and specific training needs

8. Safety Controls: Specific safety measures, permits required, and control procedures

9. Environmental Controls: Environmental protection measures and waste management procedures

10. Emergency Procedures: Emergency response plans, first aid arrangements, and emergency contacts

Optional Sections

1. Specialized Equipment Operations: Detailed procedures for specialized equipment use, required when project involves complex machinery or high-risk equipment

2. Hot Works Procedures: Specific controls for hot works, required when welding or hot cutting is involved

3. Confined Space Entry: Procedures for confined space work, required when work involves entering confined spaces

4. Working at Height: Additional controls for elevated work, required for activities above 2 meters

5. Night Work Procedures: Special considerations for night work, required when work is conducted during darkness

6. Traffic Management Plan: Vehicle and pedestrian management procedures, required when work affects traffic flow

7. Noise Management: Noise control measures, required for activities generating significant noise

8. Lifting Operations: Specific procedures for crane and lifting operations, required when conducting lifts

Suggested Schedules

1. Risk Assessment Matrix: Detailed risk evaluation criteria and scoring system

2. Site Layout Plans: Drawings showing work areas, access routes, and safety facilities

3. Emergency Contact List: List of emergency numbers and key personnel contacts

4. PPE Requirements Chart: Matrix of required PPE for different activities

5. Permit to Work Forms: Templates for various work permits required

6. Equipment Inspection Checklists: Daily/weekly equipment inspection forms

7. Training Records: Copies of relevant training certificates and competency records

8. Safety Data Sheets: SDS for hazardous materials to be used

9. Toolbox Talk Topics: List of daily safety briefing subjects

10. Incident Report Forms: Templates for reporting accidents and near-misses

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions
Relevant Industries

Construction

Oil and Gas

Infrastructure Development

Manufacturing

Mining and Quarrying

Utilities

Transportation

Industrial Processing

Petrochemicals

Facilities Management

Real Estate Development

Energy

Maritime Operations

Waste Management

Relevant Teams

Health and Safety

Operations

Project Management

Quality Assurance

Environmental Compliance

Risk Management

Field Operations

Emergency Response

Maintenance

Training and Development

Compliance and Regulatory Affairs

Technical Services

Site Operations

Relevant Roles

Project Manager

HSE Manager

Site Supervisor

Safety Officer

Construction Manager

Risk Assessment Specialist

Operations Manager

Quality Control Manager

Environmental Compliance Officer

Site Engineer

Technical Director

Maintenance Manager

Production Supervisor

Field Operations Coordinator

Emergency Response Coordinator

Safety Trainer

Compliance Manager

Project Engineer

Industries
Qatar Labor Law No. 14 of 2004: Primary legislation governing workplace safety and occupational health, including general duty of care, workplace safety requirements, and worker protection measures
Law No. 4 of 2009 Regarding Regulation of the Expatriates Entry, Departure, Residence and Sponsorship: Relevant for ensuring all site workers have proper work permits and legal status to work on the site
Qatar Construction Specifications (QCS 2014): Standard specifications for construction works in Qatar, including safety requirements and construction methodologies
Ministerial Decision No. 16 of 2007: Regulations regarding heat stress and working hours during summer months, particularly important for outdoor construction work
Qatar Civil Defense Safety Requirements: Fire safety and emergency response requirements for construction sites
Law No. 30 of 2002 (Environmental Protection Law): Environmental protection requirements affecting construction activities, including waste management and pollution control
Resolution No. 20 of 2021 on Occupational Safety and Health Requirements: Specific occupational safety and health requirements including PPE, safety training, and workplace hazard management
Qatar Construction Standards 2010: Technical standards for construction works including safety specifications and quality requirements
Ministerial Decision No. 18 of 2014: Regulations regarding worker accommodation and welfare facilities at construction sites
Qatar Rail Safety and Environmental Regulations: Specific safety requirements for construction work near rail infrastructure or in rail development zones
Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Method Statement For Cutting Concrete Slab

A detailed procedural document for concrete slab cutting operations in Qatar, complying with QCS and local HSE regulations.

find out more

Method Statement And Risk Assessment For Landscaping

A Qatar-compliant method statement and risk assessment document for landscaping operations, detailing safety procedures and work methodologies.

find out more

Scaffold Risk Assessment And Method Statement

A mandatory safety document under Qatar law that details risk assessment and methodologies for scaffold operations, ensuring compliance with local construction and safety regulations.

find out more

Site Specific Risk Assessment And Method Statement

A mandatory safety planning document under Qatar law that combines site-specific risk assessment with detailed work procedures and control measures for construction and industrial projects.

find out more

Method Statement For Column Formwork

A technical procedure document for column formwork operations in Qatar, complying with QCS 2014 and local construction regulations.

find out more

Method Statement For Demolition Of Concrete Slab

A comprehensive method statement for concrete slab demolition operations in Qatar, outlining safety procedures and regulatory compliance requirements.

find out more

Painting Risk Assessment And Method Statement

A Qatar-compliant document detailing risk assessment and safe working procedures for painting operations, ensuring adherence to local HSE regulations and labor laws.

find out more

Method Statement And Risk Assessment For Excavation

A technical and safety compliance document required under Qatar law that details excavation methodology and risk assessment procedures.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: https://www.genieai.co/our-research
Oops! Something went wrong while submitting the form.

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our Trust Centre for more details and real-time security updates.