Site Specific Risk Assessment And Method Statement Template for Ireland

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Site Specific Risk Assessment And Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Site Specific Risk Assessment And Method Statement

"I need a Site Specific Risk Assessment and Method Statement for a three-story residential building renovation project in Dublin, including scaffolding work and electrical installations, starting March 2025."

Document background
The Site Specific Risk Assessment And Method Statement (RAMS) is a fundamental safety management document required by Irish law for high-risk work activities. It is mandated under the Safety, Health and Welfare at Work Act 2005 and associated regulations, particularly for construction and hazardous operations. The document must be prepared before work commences and requires regular updates as site conditions or work methods change. It combines two crucial elements: a comprehensive risk assessment that identifies and evaluates potential hazards, and a detailed method statement outlining safe work procedures. The RAMS must be specific to each site and project, taking into account local conditions, weather, surrounding activities, and other environmental factors. It serves multiple purposes: ensuring legal compliance, protecting worker safety, providing a reference for safe work procedures, and demonstrating due diligence in safety management.
Suggested Sections

1. Document Control: Document version, revision history, and approval status

2. Project Information: Project details, location, client information, and key contacts

3. Scope of Works: Detailed description of work activities covered by this RAMS

4. Project Team and Responsibilities: Key personnel, their roles, and responsibilities in implementing the RAMS

5. Risk Assessment Methodology: Explanation of risk assessment process, risk rating matrix, and evaluation criteria

6. Hazard Identification and Risk Assessment: Detailed analysis of all potential hazards and their associated risks

7. Control Measures: Specific control measures to mitigate identified risks

8. Method Statement: Step-by-step description of how work will be carried out safely

9. Emergency Procedures: Emergency response plans and procedures

10. Training Requirements: Required qualifications, certifications, and training for personnel

11. PPE Requirements: Detailed list of required Personal Protective Equipment

12. Plant and Equipment: List of equipment to be used and associated safety requirements

13. Environmental Controls: Measures to protect the environment and manage waste

14. Monitoring and Review: Procedures for monitoring compliance and reviewing the RAMS

Optional Sections

1. Confined Space Entry Procedures: Required when work involves confined space entry

2. Working at Height Procedures: Required for any work conducted above ground level

3. Hot Works Procedures: Required for welding, cutting, or other hot work activities

4. Lifting Operations: Required when crane or mechanical lifting operations are involved

5. Excavation Procedures: Required for any ground works or excavation activities

6. Noise Management: Required when work involves high noise levels

7. Traffic Management Plan: Required when work affects vehicle or pedestrian traffic

8. Hazardous Substance Controls: Required when handling dangerous materials or chemicals

9. COVID-19 Controls: Required during pandemic conditions

10. Night Work Procedures: Required for work conducted outside normal daylight hours

Suggested Schedules

1. Risk Assessment Matrix: Detailed risk evaluation criteria and scoring system

2. Site Layout Plan: Drawing showing work areas, access points, and emergency facilities

3. Emergency Contact List: List of emergency contacts and procedures

4. Tool Box Talk Records: Forms for recording safety briefings and attendees

5. Daily Safety Inspection Checklist: Forms for daily safety checks

6. PPE Inspection Forms: Checklists for PPE inspection and maintenance

7. Equipment Inspection Records: Forms for plant and equipment safety checks

8. Permit to Work Forms: Templates for various work permits

9. Safety Data Sheets: Information sheets for any hazardous materials

10. Training Records: Copies of relevant training certificates and qualifications

11. Risk Assessment Review Log: Form for recording reviews and updates to the RAMS

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions
Relevant Industries

Construction

Manufacturing

Mining and Quarrying

Utilities

Infrastructure

Telecommunications

Oil and Gas

Chemical Processing

Warehousing and Logistics

Renewable Energy

Demolition

Civil Engineering

Industrial Maintenance

Facilities Management

Transportation

Relevant Teams

Health and Safety

Operations

Project Management

Quality Assurance

Site Operations

Risk Management

Compliance

Environmental

Engineering

Production

Maintenance

Technical Services

Construction Management

Facilities Management

Emergency Response

Relevant Roles

Health and Safety Manager

Project Manager

Site Supervisor

Construction Manager

Risk Assessment Specialist

Safety Officer

Operations Manager

Site Engineer

Project Engineer

Works Manager

Environmental Health Officer

Quality Control Manager

Facilities Manager

Production Manager

Maintenance Manager

HSE Coordinator

Safety Consultant

Construction Director

Technical Manager

Compliance Officer

Industries
Safety, Health and Welfare at Work Act 2005: Primary legislation governing workplace safety in Ireland, establishing the fundamental requirements for risk assessments and safety management
Safety, Health and Welfare at Work (General Application) Regulations 2007: Provides detailed requirements for workplace risk assessments, including specific provisions for various workplace hazards and risk control measures
Safety, Health and Welfare at Work (Construction) Regulations 2013: Specific regulations for construction work, including requirements for risk assessments and method statements in construction projects
Safety, Health and Welfare at Work (Reporting of Accidents and Dangerous Occurrences) Regulations 2016: Details requirements for reporting accidents and dangerous occurrences, which should be considered in risk assessments
Safety, Health and Welfare at Work (General Application) (Amendment) Regulations 2020: Updates to general application regulations including biological hazards, which became particularly relevant due to COVID-19
Safety, Health and Welfare at Work (Chemical Agents) Regulations 2001: Specific requirements for assessing and managing risks related to chemical agents in the workplace
Safety, Health and Welfare at Work (Work at Height) Regulations 2006: Specific requirements for assessing and managing risks related to working at height
European Communities (Protection of Workers) (Exposure to Noise) Regulations 2006: Requirements for assessing and managing risks related to noise exposure in the workplace
Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Method Statement And Risk Assessment For Landscaping

An Irish-compliant document detailing safe working methods and risk assessments for landscaping operations, meeting HSA requirements.

find out more

Site Specific Risk Assessment And Method Statement

An Irish regulatory-compliant document combining risk assessment and safe work methods, required under the Safety, Health and Welfare at Work Act 2005.

find out more

Method Statement For Demolition Of Concrete Slab

A technical document outlining procedures and safety measures for concrete slab demolition under Irish construction regulations.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: https://www.genieai.co/our-research
Oops! Something went wrong while submitting the form.

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our Trust Centre for more details and real-time security updates.