Site Specific Risk Assessment And Method Statement Template for Nigeria

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Site Specific Risk Assessment And Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Site Specific Risk Assessment And Method Statement

"I need a Site Specific Risk Assessment and Method Statement for a new telecommunications tower installation project in Lagos, Nigeria, scheduled for March 2025, with particular emphasis on working at height procedures and local community safety considerations."

Document background
The Site Specific Risk Assessment And Method Statement (RAMS) is a fundamental document required under Nigerian health and safety regulations, particularly the Factories Act and Labour Act. It serves as a crucial tool for identifying and mitigating workplace risks while providing detailed methodologies for safe work execution. This document is mandatory for most construction and industrial projects in Nigeria, especially those involving high-risk activities or significant safety considerations. The RAMS must be prepared before work commencement and requires regular updates to reflect changing site conditions or work methodologies. It combines risk assessment principles with practical work procedures, ensuring compliance with both federal and state-specific safety requirements while protecting workers and assets.
Suggested Sections

1. Document Control Information: Document reference number, revision history, and approval status

2. Project Information: Site address, project description, scope of works, and key stakeholders

3. Site Description: Detailed description of the site, including access points, existing structures, and environmental conditions

4. Risk Assessment Methodology: Explanation of risk assessment approach, risk matrix, and scoring system used

5. Hazard Identification: Comprehensive list of identified hazards associated with the work

6. Risk Assessment: Detailed assessment of each identified hazard, including likelihood and severity ratings

7. Control Measures: Specific control measures for each identified risk

8. Method Statement: Step-by-step description of how the work will be carried out safely

9. Resource Requirements: Personnel, equipment, and materials needed for the work

10. PPE Requirements: Detailed list of required Personal Protective Equipment

11. Training Requirements: Specific training and competency requirements for personnel

12. Emergency Procedures: Emergency response plans and procedures

13. Communication Plan: Details of how safety information will be communicated to workers

Optional Sections

1. Environmental Impact Assessment: Required when work has significant environmental implications

2. Noise Assessment: Required for works involving high noise levels

3. Traffic Management Plan: Required when work affects public roads or site traffic

4. Confined Space Entry Procedures: Required for works involving confined space entry

5. Working at Height Procedures: Required for works involving activities at height

6. Lifting Operations Plan: Required when crane or lifting operations are involved

7. Hazardous Substances Assessment: Required when handling dangerous or hazardous materials

8. Night Work Procedures: Required for works conducted during night hours

Suggested Schedules

1. Risk Assessment Matrix: Detailed risk scoring matrix and assessment criteria

2. Site Layout Plans: Drawings showing site layout, access points, and work areas

3. Equipment Certificates: Copies of relevant equipment certification and inspection records

4. Training Records: Copies of relevant personnel training certificates

5. Emergency Contact List: List of emergency contacts and key personnel

6. Permit to Work Forms: Templates for any required work permits

7. Daily Inspection Checklists: Templates for daily safety inspections

8. Toolbox Talk Templates: Templates for safety briefings and toolbox talks

9. Incident Report Forms: Templates for reporting accidents and incidents

10. Material Safety Data Sheets: MSDS for any hazardous materials being used

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions
Relevant Industries

Construction

Oil and Gas

Manufacturing

Mining

Infrastructure Development

Industrial Processing

Utilities

Telecommunications

Chemical Processing

Warehousing and Logistics

Healthcare Facilities

Educational Institutions

Relevant Teams

Health Safety and Environment

Operations

Project Management

Quality Assurance

Engineering

Site Operations

Risk Management

Compliance

Emergency Response

Facilities Management

Relevant Roles

Health and Safety Manager

Project Manager

Site Supervisor

Construction Manager

Risk Assessment Specialist

Environmental Compliance Officer

Operations Manager

Quality Control Manager

Safety Coordinator

Civil Engineer

Mechanical Engineer

Electrical Engineer

HSE Officer

Site Engineer

Facilities Manager

Industries
Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Coshh Assessment Form

A Nigerian-compliant assessment form for evaluating and controlling risks associated with hazardous substances in the workplace, aligned with the Factories Act and safety regulations.

find out more

Severity Risk Assessment Matrix

A risk assessment framework compliant with Nigerian regulations for evaluating and categorizing operational risks based on severity and likelihood.

find out more

Risk Maturity Assessment Report

A detailed assessment of organizational risk management maturity and capabilities, prepared in compliance with Nigerian regulatory requirements and international standards.

find out more

Risk Identification Form

A regulatory-compliant risk assessment document for Nigerian organizations to identify, evaluate, and plan risk management strategies in accordance with local laws.

find out more

Risk Evaluation Form

A standardized risk assessment document compliant with Nigerian regulations for identifying and evaluating workplace hazards and implementing control measures.

find out more

Risk Assessment Matrix Oil And Gas

A structured risk assessment framework for oil and gas operations in Nigeria, ensuring compliance with local regulations while providing comprehensive risk evaluation and mitigation strategies.

find out more

Quality Risk Assessment SOP

A comprehensive SOP for quality risk assessment processes compliant with Nigerian NAFDAC requirements and international standards.

find out more

Risk Assessment SOP

A Standard Operating Procedure for conducting risk assessments in compliance with Nigerian legislation and safety regulations.

find out more

Hazard Assessment Process

A Nigerian-compliant hazard assessment process document outlining procedures for workplace hazard identification, evaluation, and control measures.

find out more

Basic Risk Assessment Matrix

A structured risk assessment framework compliant with Nigerian regulations, designed for systematic identification and management of organizational risks.

find out more

First Aid Needs Assessment Form

A structured assessment form for evaluating workplace first aid requirements and provisions under Nigerian health and safety regulations.

find out more

AML CFT Risk Assessment Report

A Nigerian law-compliant assessment report analyzing an organization's money laundering and terrorist financing risks, control effectiveness, and recommended improvements.

find out more

Risk Assessment Letter

A formal risk evaluation document compliant with Nigerian regulations that identifies, analyzes, and provides mitigation strategies for business or project-related risks.

find out more

Risk Assessment Form Project Management

A Nigerian-compliant project management risk assessment form for systematic risk identification, analysis, and mitigation in accordance with local regulations.

find out more

E Signature Risk Assessment

A risk assessment framework for e-signature implementation in Nigeria, addressing legal compliance, technical security, and operational risks under Nigerian law.

find out more

Construction Risk Assessment Report

A technical report compliant with Nigerian regulations that assesses and provides mitigation strategies for construction project risks.

find out more

Project Risk Assessment

A comprehensive risk assessment document compliant with Nigerian law that identifies, analyzes, and provides mitigation strategies for project-related risks.

find out more

RFP Risk Assessment

A Nigerian-law compliant risk assessment document for analyzing and mitigating potential risks in RFP processes.

find out more

Project Assessment Matrix

A comprehensive project evaluation tool aligned with Nigerian regulatory requirements for assessing project viability, risks, and compliance across multiple dimensions.

find out more

Site Security Assessment Report

A detailed security evaluation document compliant with Nigerian regulations that assesses site vulnerabilities and provides security enhancement recommendations.

find out more

Diesel Coshh Assessment

A Nigerian-compliant hazard assessment document for managing risks associated with diesel fuel handling and storage.

find out more

Baseline Risk Assessment

A systematic evaluation of workplace hazards and risks compliant with Nigerian safety regulations, providing control measures and risk management strategies.

find out more

Vulnerability Assessment Matrix

A structured framework for assessing and documenting security vulnerabilities in Nigerian organizations, aligned with local cybersecurity regulations and best practices.

find out more

Method Statement And Risk Assessment For Landscaping

A Nigerian-compliant method statement and risk assessment document outlining safe procedures and control measures for landscaping operations.

find out more

Hazard Identification Form

A comprehensive workplace hazard identification and assessment tool compliant with Nigerian safety regulations and workplace safety requirements.

find out more

Procurement Risk Assessment Matrix

A structured risk assessment tool for procurement processes in Nigeria, aligned with local procurement laws and regulations.

find out more

Scaffold Risk Assessment And Method Statement

A Nigerian-compliant safety and methodology document for scaffold operations, incorporating risk assessment and detailed work procedures in accordance with local regulations.

find out more

Tile Manual Handling Risk Assessment

A risk assessment document for tile handling operations compliant with Nigerian safety regulations, detailing hazards, control measures, and safety recommendations.

find out more

Standard Risk Assessment Matrix

A structured risk assessment framework compliant with Nigerian regulations, providing systematic risk evaluation and mitigation guidelines.

find out more

Site Specific Risk Assessment And Method Statement

A comprehensive risk assessment and method statement document compliant with Nigerian safety regulations, detailing workplace hazards, control measures, and safe work procedures.

find out more

Preliminary Risk Assessment Audit

A Nigerian law-governed preliminary assessment document evaluating organizational risks and providing initial recommendations for risk management and compliance.

find out more

Compliance Risk Assessment Questionnaire

A comprehensive compliance risk assessment tool aligned with Nigerian regulatory requirements, enabling organizations to evaluate their compliance status and identify potential risks.

find out more

Manual Handling Risk Assessment Tool

A comprehensive Manual Handling Risk Assessment Tool aligned with Nigerian workplace safety regulations, designed to evaluate and control manual handling risks in various workplace settings.

find out more

Financial Statement Risk Assessment

A Nigerian law-compliant assessment document that evaluates risks in financial statements and reporting processes, providing risk mitigation recommendations.

find out more

Emergency Preparedness Risk Assessment

A systematic evaluation of potential emergency risks and response strategies, compliant with Nigerian regulations and NEMA guidelines.

find out more

Criticality Assessment Matrix

A risk assessment framework document for Nigerian organizations to evaluate and prioritize operational, safety, and business risks in compliance with local regulations.

find out more

Environmental Risk Assessment Matrix

A structured environmental risk assessment framework compliant with Nigerian environmental regulations, designed to evaluate and manage environmental impacts of projects and operations.

find out more

Design Risk Assessment

A technical-legal document for evaluating and managing design-related risks in Nigerian construction and development projects, complying with local regulations and safety standards.

find out more

Generic Risk Assessment

A comprehensive workplace risk assessment document compliant with Nigerian safety and labor regulations, designed to identify and mitigate potential hazards in the workplace.

find out more

Security Assessment Report

A detailed security assessment report document compliant with Nigerian cybersecurity laws, providing comprehensive analysis of organizational security posture and improvement recommendations.

find out more

Painting Risk Assessment And Method Statement

A Nigerian-compliant risk assessment and methodology guide for safe painting operations, meeting local safety regulations and industry standards.

find out more

Business Risk Assessment Report

A comprehensive business risk assessment document compliant with Nigerian regulations that identifies, analyzes, and provides mitigation strategies for various business risks.

find out more

Automatic Gate Risk Assessment Form

A Nigerian-compliant risk assessment form for evaluating safety and operational aspects of automatic gates, ensuring alignment with local safety regulations and standards.

find out more

Task Risk Assessment Form

A standardized form used in Nigeria for evaluating and documenting workplace task-related risks and safety measures, ensuring compliance with Nigerian safety regulations.

find out more

Pre Task Risk Assessment Form

A Nigerian-compliant safety document for systematically evaluating and controlling workplace risks before task commencement.

find out more

Fire Safety Assessment Report

A technical assessment report evaluating property fire safety systems and compliance with Nigerian fire safety regulations, providing recommendations for improvements.

find out more

Corruption Risk Assessment And Mitigation Plan

A structured plan for identifying and mitigating corruption risks in organizations operating in Nigeria, ensuring compliance with local anti-corruption laws and international standards.

find out more

Biological Risk Assessment Form

A Nigerian regulatory-compliant form for assessing and documenting biological hazards and their control measures in laboratory and research settings.

find out more

Executive Summary For Risk Assessment

A strategic document summarizing key organizational risks and mitigation strategies, compliant with Nigerian regulatory requirements and corporate governance standards.

find out more

Daily Task Risk Assessment

A legally-compliant safety assessment tool under Nigerian law for evaluating and controlling daily operational risks in workplace activities.

find out more

Ppe Hazard Assessment Certification Form

A certification form for documenting PPE hazard assessments and requirements in Nigerian workplaces, compliant with national safety regulations.

find out more

Site Safety Assessment Form

A Nigerian-compliant site safety assessment document for evaluating workplace hazards and safety measures across industrial and commercial settings.

find out more

Third Party Risk Assessment Policy

A policy document outlining third-party risk assessment procedures and requirements under Nigerian law.

find out more

Internal Audit Plan Risk Assessment

A Nigerian law-compliant document that evaluates organizational risks to inform the internal audit planning process.

find out more

Building Risk Assessment Report

A technical assessment document that evaluates building-related risks and compliance requirements under Nigerian building regulations and safety standards.

find out more

IT Security Risk Assessment Report

A technical assessment document analyzing IT security risks and recommending mitigation measures in compliance with Nigerian data protection and cybersecurity regulations.

find out more

Health And Safety Policy Risk Assessment

A Nigerian-compliant workplace health and safety risk assessment document that identifies hazards, evaluates risks, and establishes control measures under Nigerian safety regulations.

find out more

Fire Risk Assessment Plan

A mandatory fire safety assessment document under Nigerian regulations that evaluates and addresses fire risks within a property, providing detailed safety measures and recommendations.

find out more

Task Specific Risk Assessment

A legally required risk evaluation document under Nigerian law that identifies, assesses, and provides control measures for specific task-related hazards in the workplace.

find out more

Ppe Hazard Assessment Form

A Nigerian-compliant workplace safety document for assessing hazards and determining required Personal Protective Equipment (PPE) requirements.

find out more

Fire Risk Assessment Report

A mandatory fire safety evaluation document under Nigerian law that assesses fire risks, existing safety measures, and provides recommendations for improvement in compliance with national regulations.

find out more

Audit Plan Risk Assessment

A Nigerian-compliant audit planning document that outlines the systematic approach to identifying and assessing audit risks under CAMA 2020 and local regulatory requirements.

find out more

IT Risk Assessment Report

A comprehensive evaluation of organization's IT risks and security controls, compliant with Nigerian regulatory requirements including NDPR and NITDA guidelines.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: https://www.genieai.co/our-research
Oops! Something went wrong while submitting the form.

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our Trust Centre for more details and real-time security updates.