Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Method Statement And Risk Assessment For Excavation
"I need a Method Statement and Risk Assessment for Excavation for a 15-meter deep basement excavation in West Bay, Qatar for a commercial tower project starting March 2025, with specific focus on dewatering requirements and adjacent building protection."
1. Document Control: Document revision history, distribution list, and approval signatures
2. Project Information: Details of the project, location, client, main contractor, and key stakeholders
3. Scope of Work: Detailed description of excavation works to be undertaken, including dimensions, depths, and purpose
4. Resources: List of personnel, equipment, materials, and competencies required for the work
5. Method Statement: Step-by-step procedure for executing the excavation works safely
6. Risk Assessment: Identification of hazards, risk evaluation, and control measures specific to excavation activities
7. Safety Requirements: Specific safety measures, PPE requirements, and emergency procedures
8. Environmental Controls: Measures to protect environment and manage waste during excavation
9. Quality Control: Quality assurance measures and inspection requirements
10. Emergency Response: Emergency procedures, contact numbers, and evacuation plans
1. Temporary Works: Details of shoring, dewatering, and other temporary support systems when required for deep excavations
2. Traffic Management Plan: Required when excavation affects public roads or site traffic
3. Noise Management: Include when working in noise-sensitive areas or during restricted hours
4. Utility Protection Measures: Required when working near existing underground services
5. Public Protection Measures: Include when working in public areas or near occupied buildings
6. Night Work Provisions: Required for projects involving night-time excavation works
1. Schedule A - Risk Assessment Matrix: Detailed risk assessment tables and scoring methodology
2. Schedule B - Site Layout Plans: Drawings showing excavation areas, access points, and safety arrangements
3. Schedule C - Equipment Certificates: Certificates for excavation equipment and operator competencies
4. Schedule D - Permit Requirements: List of required permits and certificates for the works
5. Schedule E - Emergency Contact List: Emergency contact details for key personnel and emergency services
6. Appendix 1 - Inspection Checklists: Daily and periodic inspection forms for excavation works
7. Appendix 2 - Toolbox Talk Topics: Safety briefing materials specific to excavation activities
8. Appendix 3 - Referenced Standards: Relevant Qatar construction and safety standards applicable to the works
Authors
Competent Person
Method Statement
Risk Assessment
PPE (Personal Protective Equipment)
Shoring
Benching
Sloping
Trench
Confined Space
Dewatering
Ground Conditions
Safe Working Load
Permit to Work
Underground Services
Temporary Works
Site Supervisor
Emergency Response Plan
Critical Lift
Hazard
Risk
Control Measures
Safety Factor
Access/Egress
Spoil
Working Platform
Zone of Influence
Authorized Person
RAMS (Risk Assessment Method Statement)
Toolbox Talk
Hot Work
Site Establishment
Environmental Aspect
Environmental Impact
Quality Control Points
Hold Point
Witness Point
As-Built Drawing
Backfilling
Project Site
Work Area
Safe System of Work
Plant and Equipment
Competency
Project Information
Scope of Works
Resource Requirements
Method and Sequence
Risk Assessment
Health and Safety
Environmental Protection
Quality Control
Emergency Procedures
Training Requirements
Equipment Specifications
Site Setup
Access Requirements
Underground Services Protection
Ground Conditions
Temporary Works
Monitoring and Inspection
Communication Procedures
Waste Management
Traffic Management
Public Protection
Personal Protective Equipment
Permit Requirements
Compliance Requirements
Construction
Infrastructure Development
Oil & Gas
Real Estate Development
Industrial Development
Utilities
Transportation
Mining
Water Management
Public Works
Health Safety Environment
Operations
Engineering
Quality Control
Project Management
Risk Management
Construction
Technical Services
Compliance
Site Operations
Project Manager
HSE Manager
Site Engineer
Construction Manager
Risk Assessment Specialist
Safety Officer
Quality Control Engineer
Civil Engineer
Operations Manager
Technical Director
Environmental Specialist
Construction Supervisor
Project HSE Officer
Permits Coordinator
Find the exact document you need
Method Statement For Cutting Concrete Slab
A detailed procedural document for concrete slab cutting operations in Qatar, complying with QCS and local HSE regulations.
Method Statement And Risk Assessment For Landscaping
A Qatar-compliant method statement and risk assessment document for landscaping operations, detailing safety procedures and work methodologies.
Scaffold Risk Assessment And Method Statement
A mandatory safety document under Qatar law that details risk assessment and methodologies for scaffold operations, ensuring compliance with local construction and safety regulations.
Site Specific Risk Assessment And Method Statement
A mandatory safety planning document under Qatar law that combines site-specific risk assessment with detailed work procedures and control measures for construction and industrial projects.
Method Statement For Column Formwork
A technical procedure document for column formwork operations in Qatar, complying with QCS 2014 and local construction regulations.
Method Statement For Demolition Of Concrete Slab
A comprehensive method statement for concrete slab demolition operations in Qatar, outlining safety procedures and regulatory compliance requirements.
Painting Risk Assessment And Method Statement
A Qatar-compliant document detailing risk assessment and safe working procedures for painting operations, ensuring adherence to local HSE regulations and labor laws.
Method Statement And Risk Assessment For Excavation
A technical and safety compliance document required under Qatar law that details excavation methodology and risk assessment procedures.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.