Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Method Statement For Demolition Of Concrete Slab
"I need a Method Statement For Demolition Of Concrete Slab for a commercial warehouse renovation project in Dublin, scheduled for March 2025, with particular emphasis on dust control measures due to proximity to food processing facilities and strict environmental requirements."
1. Project Information: Details of the project location, client, principal contractor, and key contacts
2. Scope of Works: Detailed description of the concrete slab to be demolished, including dimensions, location, and any known hazards
3. Site Survey and Risk Assessment: Findings from pre-demolition surveys and comprehensive risk assessment
4. Resource Requirements: List of personnel, equipment, and materials needed for the demolition
5. Safety Measures: Detailed safety procedures, PPE requirements, and control measures
6. Sequence of Operations: Step-by-step breakdown of the demolition process
7. Environmental Controls: Measures to control dust, noise, vibration, and waste management
8. Emergency Procedures: Emergency response plans and contact information
9. Communication Plan: Details of how information will be communicated between all parties
10. Quality Control: Inspection and verification procedures during and after demolition
1. Utilities Management: Required when live services are present in or near the work area
2. Traffic Management: Needed when demolition affects vehicle or pedestrian routes
3. Noise Assessment: Required when working in noise-sensitive areas or during restricted hours
4. Hazardous Materials Procedure: Include when asbestos or other hazardous materials are suspected
5. Temporary Works Design: Required when temporary supports or structures are needed
6. Public Protection Measures: Needed when work is adjacent to public areas
7. Ground Conditions Assessment: Include when demolition might affect ground stability
1. Risk Assessment Matrix: Detailed risk assessment tables and control measures
2. Site Layout Plans: Drawings showing work areas, access routes, and safety zones
3. Equipment Specifications: Technical details of major equipment to be used
4. Training Records: Certificates and qualifications of key personnel
5. Method Statement Briefing Record: Sign-off sheet for worker acknowledgment of procedures
6. Emergency Contact List: Complete list of emergency contacts and procedures
7. Inspection Checklists: Daily/weekly safety and quality control checklists
8. Photographic Survey: Pre-demolition photographs of the site and surrounding areas
Authors
Principal Contractor
Client
Site Supervisor
Method Statement
Risk Assessment
PPE (Personal Protective Equipment)
Exclusion Zone
Breaking Out
Demolition Zone
Safe Working Load
Permit to Work
RAMS (Risk Assessment and Method Statement)
Control Measures
Emergency Procedures
Site Boundary
Working Platform
Mechanical Breaking
Manual Breaking
Temporary Works
Structural Engineer
Site Induction
Hazard
Risk
Safety Data Sheet
Construction Phase Plan
Safe System of Work
Environmental Controls
Waste Management
Site Layout Plan
Access Route
Loading Area
Inspection Record
Toolbox Talk
Plant and Equipment
Dust Suppression
Vibration Monitoring
Noise Level
Concrete Reinforcement
Load Bearing Structure
Health and Safety
Risk Assessment
Site Access and Security
Environmental Protection
Operational Procedures
Equipment and Resources
Personnel Requirements
Emergency Procedures
Quality Control
Regulatory Compliance
Waste Management
Noise and Vibration Control
Public Protection
Site Management
Communication Protocols
Inspection and Testing
Documentation Requirements
Training and Competency
Monitoring and Review
Construction
Civil Engineering
Demolition
Property Development
Infrastructure
Industrial
Commercial Real Estate
Mining
Manufacturing
Waste Management
Health and Safety
Operations
Project Management
Engineering
Quality Assurance
Environmental Compliance
Site Operations
Risk Management
Construction
Technical Services
Site Manager
Health and Safety Manager
Project Engineer
Construction Manager
Demolition Supervisor
Risk Assessment Officer
Environmental Compliance Officer
Construction Site Supervisor
Quality Control Inspector
Operations Manager
Project Director
Safety Coordinator
Civil Engineer
Structural Engineer
Construction Foreman
Find the exact document you need
Method Statement And Risk Assessment For Landscaping
An Irish-compliant document detailing safe working methods and risk assessments for landscaping operations, meeting HSA requirements.
Site Specific Risk Assessment And Method Statement
An Irish regulatory-compliant document combining risk assessment and safe work methods, required under the Safety, Health and Welfare at Work Act 2005.
Method Statement For Demolition Of Concrete Slab
A technical document outlining procedures and safety measures for concrete slab demolition under Irish construction regulations.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.