Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Extension Of Time Letter
"I need an Extension of Time Letter for our Swiss construction project due to unprecedented snowfall in January 2025, requesting a 45-day extension and including evidence from weather reports."
1. Letter Header: Formal business letter header including date, recipient details, project reference number, and contract reference
2. Subject Line: Clear indication that this is an Extension of Time Request for the specific project
3. Contract Reference: Reference to the relevant contract clause(s) under which the extension is being requested
4. Current Programme Status: Brief statement of the current project status and existing completion date
5. Extension Request: Clear statement of the additional time being requested and new proposed completion date
6. Delay Event Description: Detailed description of the event(s) causing the delay
7. Impact Analysis: Explanation of how the delay event affects the project timeline
8. Mitigation Measures: Description of steps taken or proposed to minimize the delay impact
9. Closing: Request for review and approval, with signature block
1. Cost Implications: Include when the delay events result in additional costs that need to be addressed
2. Third Party Delays: Include when delays are caused by other contractors or third parties
3. Force Majeure Declaration: Include when the delay is caused by force majeure events as defined in the contract
4. Concurrent Delays: Include when there are multiple delay events occurring simultaneously
5. Previous Correspondence: Include when referencing prior communications about the delay event
1. Delay Analysis Report: Detailed analysis of the delay event and its impact on the project schedule
2. Updated Programme: Revised project schedule showing the impact of the delay
3. Supporting Documentation: Relevant correspondence, photographs, weather records, or other evidence supporting the delay claim
4. Critical Path Analysis: Analysis showing how the delay affects the project's critical path
5. Meeting Minutes: Records of relevant meetings discussing the delay event
6. Notice Records: Copies of any previously issued delay notices or early warnings
Authors
Base Contract
Completion Date
Critical Path
Delay Event
Extension Period
Force Majeure
Key Milestone Dates
Original Contract Period
Programme of Works
Project
Revised Completion Date
Site
Time Impact Analysis
Works
Working Day
Compensation Event
Concurrent Delay
Contract Documents
Delay Notice
Excusable Delay
Extension of Time
Mitigation Measures
Practical Completion
Progress Schedule
Site Conditions
Substantial Completion
Construction
Infrastructure
Real Estate Development
Manufacturing
Engineering
Energy
Transportation
Public Works
Industrial Development
Commercial Development
Telecommunications
Mining
Healthcare Construction
Education Construction
Legal
Project Management
Construction Management
Contract Administration
Commercial
Planning
Project Controls
Risk Management
Operations
Technical Services
Project Manager
Construction Manager
Contract Administrator
Project Director
Site Manager
Claims Manager
Commercial Manager
Legal Counsel
Planning Engineer
Project Control Manager
Construction Director
Technical Director
Chief Engineer
Contracts Manager
Risk Manager
Find the exact document you need
Proposal Letter
A formal business proposal document governed by Swiss law that outlines specific business propositions, products, or services while ensuring compliance with Swiss legal requirements.
Cover Letter (Education)
A formal educational cover letter compliant with Swiss business standards and data protection laws, used for academic positions and educational program applications in Swiss institutions.
Application Letter For Teacher Fresh Graduate
A formal job application letter for newly graduated teachers entering the Swiss education system, following Swiss legal and professional standards.
Professional Business Letter
A formal business communication document conforming to Swiss legal requirements and business etiquette, used for official corporate correspondence in Switzerland.
Joining Letter After Medical Leave
A Swiss-compliant formal letter documenting an employee's return to work after medical leave, including any modified terms or necessary accommodations.
Leave Extension Letter
A formal document under Swiss law that extends an employee's existing leave period, outlining the terms and conditions of the extension.
Transfer Letter To Employee From One Location To Another
A Swiss law-compliant letter documenting an employee's internal transfer to a new location, outlining transfer terms and conditions under Swiss employment regulations.
Loan Request Letter To Bank
A formal written request for a loan facility addressed to a Swiss bank, outlining the loan requirements and applicant's credentials under Swiss banking regulations.
Document Submission Letter
A formal Swiss business document used as an official cover letter for submitting documentation to authorities or institutions, compliant with Swiss law and administrative requirements.
Attachment Application Letter
A formal Swiss law-compliant letter requesting the attachment of additional documents or modifications to an existing agreement.
Application Letter For Sick Leave
A formal request for sick leave under Swiss employment law, submitted by an employee to their employer with necessary medical documentation.
Application Letter For Cashier
A formal Swiss-compliant job application letter for a cashier position, following local business correspondence standards and employment regulations.
Application For Recommendation Letter
A formal request for a recommendation letter under Swiss law, outlining the applicant's background and specific requirements for the recommender.
Letter Of Commendation
A formal Swiss document recognizing exceptional professional achievement or contribution, governed by Swiss employment law and professional standards.
Cash Advance Letter
A Swiss law-governed document establishing terms and conditions for providing immediate financial assistance through cash advance, including repayment terms and obligations.
Leave Application Letter
A formal document used in Swiss employment contexts to request and document time off from work, complying with Swiss employment law and company policies.
Contract Renewal Letter
A formal letter under Swiss law used to extend an existing contract's duration, outlining renewal terms and any modifications to the original agreement.
Public Health Cover Letter
A formal Swiss-compliant cover letter for public health-related communications, adhering to federal and cantonal requirements for official health correspondence.
Guarantor Letter
A Swiss law-governed formal undertaking where a guarantor secures the obligations of a principal debtor to a beneficiary, subject to specific requirements under the Swiss Code of Obligations.
Care Assistant Cover Letter
A formal application document for care assistant positions in Switzerland, introducing the candidate's qualifications and experience in accordance with Swiss healthcare standards.
Application Letter For Teaching
A formal teaching application letter compliant with Swiss business standards and cantonal education requirements, used for applying to teaching positions in Swiss educational institutions.
Vacation Leave Letter For Personal Reason
A formal letter requesting vacation leave for personal reasons under Swiss employment law, documenting leave dates and arrangements.
Thank You Mail For Promotion
A formal Swiss business communication document acknowledging an employee's promotion and expressing gratitude, serving as an official record while maintaining professional relationships.
Salary Certificate Request
A formal request document under Swiss law for obtaining official certification of employment income and compensation details from an employer.
Request Letter For Payment Release
A formal Swiss-law compliant document requesting the release of payment for goods or services, including all necessary payment and reference details as required under Swiss regulations.
Mail For Maternity Leave
A formal notification letter for maternity leave under Swiss law, including leave dates and arrangements as per federal labor regulations.
Loan Rejection Letter
A formal Swiss-compliant letter notifying an applicant of their loan application rejection, including mandatory disclosures and rights under Swiss banking regulations.
Letter Request For Transfer
A Swiss-compliant formal letter authorizing and requesting the transfer of funds between specified accounts, subject to Swiss banking regulations.
Letter Of Assistance
A Swiss law-governed formal document establishing terms for providing specific support or services between parties.
Letter For Financial Support
A Swiss-law governed formal declaration of financial support commitment from a guarantor to a beneficiary, typically used for immigration, education, or family support purposes.
Company Experience Letter
A Swiss-law compliant formal document issued by employers detailing an employee's work history, performance, and conduct as required by Article 330a of the Swiss Code of Obligations.
Volunteer Application Letter
A Swiss-law governed application letter for initiating a volunteer relationship with an organization, including personal details and qualifications.
Reference Letter For Visa Application
A formal supporting document for Swiss visa applications that complies with Swiss immigration laws and provides verified information about the visa applicant.
Experience Certificate Request Letter
A formal letter requesting an employment certificate from an employer in Switzerland, as entitled under Swiss employment law.
Cover Letter For Management Trainee
A formal Swiss-compliant cover letter introducing a candidate's qualifications and motivation for a management trainee position, following Swiss business correspondence standards.
Banking Cover Letter
A formal Swiss banking document that accompanies official banking communications and documentation, adhering to Swiss banking regulations and compliance requirements.
Application Letter For Bank Statement
A formal request letter to Swiss banks for obtaining official bank statements, complying with Swiss banking laws and customer verification requirements.
Registration Letter For Company
A formal letter required under Swiss law for registering a new company with the Commercial Register, containing essential company formation details and registration requirements.
Thank You For Your Service Letter
A formal letter under Swiss law expressing gratitude to departing employees for their service and contributions to the organization.
Emergency Leave Mail For Family Problem
A Swiss-compliant emergency leave request email template for family-related issues, structured according to Swiss employment law requirements.
Sick Leave Request Mail
A formal email notification for sick leave in Switzerland, complying with Swiss employment law requirements and company policies.
Character Certificate Letter
A Swiss-compliant official document certifying an individual's moral character and standing in the community, issued by authorized Swiss authorities.
New Hire Welcome Letter
A Swiss-law compliant welcome letter for new employees that combines essential employment information with a warm welcome message and practical onboarding details.
Internship Appointment Letter
A Swiss law-compliant appointment letter establishing an internship relationship, detailing terms, conditions, and mutual obligations under Swiss employment regulations.
Letter To Bank For Change Of Address
A formal Swiss banking document used to notify banks of an account holder's change of address, complying with Swiss banking regulations and privacy laws.
Extension Of Time Letter
A formal request letter under Swiss law for extending project completion dates, detailing delay causes and required additional time, aligned with Swiss Code of Obligations and SIA norms.
Application Letter For Nursing Job
A formal nursing job application letter compliant with Swiss healthcare employment regulations and professional standards.
Volunteer Reference Letter
A Swiss-compliant formal document validating a person's volunteer service, detailing their role, responsibilities, and performance within an organization.
Referral Letter For Job
A formal Swiss-compliant letter of recommendation for employment purposes, providing professional endorsement while adhering to Swiss business standards and regulations.
Leave Letter For Personal Reason
A formal leave request letter compliant with Swiss employment law, used to request personal time off while maintaining professional standards and legal requirements.
Extension Request Letter
A Swiss law-compliant formal letter requesting an extension to an existing contract, following Swiss Code of Obligations requirements.
Doctor Appointment Letter
A Swiss-compliant formal employment offer letter for medical professionals, outlining position terms and conditions in accordance with Swiss healthcare regulations.
Emergency Leave Letter
A formal document used in Swiss employment context to request and document emergency leave from work, complying with Swiss employment law requirements.
Letter Offering Employment
A formal employment offer document compliant with Swiss law that outlines key employment terms and conditions for prospective employees.
Leave Letter For Medical Leave
A formal medical leave request letter compliant with Swiss employment law, documenting an employee's temporary absence due to medical reasons.
Proof Of Payment Letter
A Swiss law-compliant formal letter confirming receipt of payment, serving as legal proof of transaction completion.
Hospital Appointment Letter
A Swiss-law governed employment offer letter used by healthcare institutions to appoint medical and non-medical staff, outlining key terms and conditions of hospital employment.
Holiday Application Letter
A formal request document for planned vacation time under Swiss employment law, detailing holiday dates and work coverage arrangements.
Handwritten Employment Job Application Letter
A formal handwritten job application letter compliant with Swiss legal requirements and business customs, serving as the primary introduction of a candidate to a potential employer.
Change Of Address Letter
A formal Swiss-compliant notification letter informing relevant parties of a residential or business address change, meeting federal and cantonal requirements.
Application For Annual Leave Letter
A formal request document for paid vacation time under Swiss employment law, used to process and record annual leave applications in compliance with legal requirements.
Transcript Request Letter
A formal letter used in Switzerland to request academic transcripts from educational institutions, complying with Swiss data protection and administrative requirements.
Thank You Letter To Boss For Support During Difficult Times
A formal thank you letter to a supervisor for their support during difficult times, drafted in accordance with Swiss business practices and employment regulations.
Renewal Letter
A Swiss law-governed formal letter confirming the renewal of an existing contract, including renewal terms and any modifications.
Letter Of Transfer Of Ownership
A Swiss-law governed formal document that officiates the transfer of ownership rights from one party to another, complying with Swiss Civil Code requirements.
Letter Of Support For Grant
A Swiss-law governed formal document providing official support and commitment for a grant application, including specific pledges of assistance and organizational backing.
Payment Received Letter
A Swiss law-governed formal letter confirming receipt of payment, serving as legal proof of payment and documentation for accounting purposes.
Formal Application Letter
A formal Swiss application letter serving as a professional introduction between job seeker and potential employer, following Swiss business and legal standards.
Check Book Request Letter
A formal letter used in Swiss banking to request a new checkbook, containing account details and following Swiss banking regulations.
Job Application Letter For Accountant
A formal job application letter for accounting positions in Switzerland, following Swiss business standards and employment laws.
Hire Letter
A formal employment document establishing key terms and conditions of employment under Swiss law, serving as a legally binding contract between employer and employee.
Loan Request Letter
A formal loan application letter compliant with Swiss banking regulations and the Swiss Code of Obligations, outlining loan requirements and borrower details.
Letter Of Financial Support For Visa
A Swiss-compliant legal document where a sponsor declares financial responsibility for a visa applicant's stay in Switzerland, meeting federal immigration requirements.
Car Booking Cancellation Letter
A formal letter under Swiss law for cancelling a vehicle rental booking, ensuring compliance with Swiss contractual requirements while protecting all parties' interests.
Application Request Letter
A formal Swiss-compliant letter requesting application materials or initiating an application process with an organization or authority in Switzerland.
Application Letter For Nursing
A formal nursing job application letter conforming to Swiss healthcare regulations and professional standards.
To Whom It May Concern Letter Of Financial Support
A Swiss-law governed formal declaration document establishing a sponsor's commitment to provide financial support to a beneficiary, typically used for educational or immigration purposes.
Tender Application Letter
A formal letter expressing interest and commitment to participate in a Swiss tender process, complying with federal and cantonal procurement regulations.
Transfer Certificate Letter
A Swiss law-governed document certifying the formal transfer of assets, rights, or obligations between parties, providing legal evidence of the transfer transaction.
Loan Letter
A Swiss law-governed letter documenting loan terms and conditions between lender and borrower, compliant with the Swiss Code of Obligations.
Loan Application Letter
A formal credit request document prepared under Swiss law, outlining loan requirements and applicant details for financial institutions.
Letter Of Employment Verification
A Swiss-compliant formal document confirming an individual's employment status and details, used for official verification purposes.
Appreciation Letter For Support
A formal appreciation letter governed by Swiss law that professionally acknowledges support or contributions received, adhering to Swiss business communication standards.
Application Letter For Employment
A formal Application Letter For Employment compliant with Swiss business standards and employment laws, serving as the primary introduction document in a job application package.
Termination Of Services Letter To Vendor
A formal notice under Swiss law for terminating vendor services, outlining termination details and transition requirements in compliance with the Swiss Code of Obligations.
Probation Extension Letter
A Swiss law-compliant document extending an employee's probationary period, specifying new duration and terms while maintaining original employment conditions.
Loan Confirmation Letter
A Swiss law-governed document confirming approved loan terms and conditions, issued by a lender to formalize their commitment to provide financing.
Job Employment Letter
A legally binding employment letter compliant with Swiss law that establishes the key terms and conditions of employment between employer and employee.
Credit Card Cancellation Letter
A formal notice under Swiss law requesting the cancellation of a credit card agreement with a financial institution, including all necessary account and cardholder information.
Advance Payment Request Letter
A formal request document under Swiss law for obtaining advance payment for contracted goods or services, including payment details and supporting justification.
Transfer Letter
A Swiss law-governed document formalizing an employee's transfer between entities, outlining key transfer terms and conditions in compliance with Swiss employment regulations.
Loan Cancellation Letter
A Swiss law-governed document that formally cancels an existing loan agreement and releases all related obligations between lender and borrower.
Remittance Letter
A Swiss-law governed formal banking document providing instructions and authorization for fund transfers, compliant with Swiss banking regulations.
Certificate Of Employment Letter
A legally mandated Swiss employment certificate that provides a detailed and objective assessment of an employee's work history, performance, and conduct under Swiss law.
Letter Of Authorization
A Swiss-law governed document that formally delegates specific authority from one party to another, complying with Swiss legal requirements for authorization and representation.
Application Withdrawal Letter
A formal letter under Swiss law for withdrawing a previously submitted application, ensuring compliance with Swiss legal requirements and data protection regulations.
Scholarship Application Letter
A Swiss-compliant formal letter requesting scholarship funding, adhering to federal and cantonal education laws and scholarship application requirements.
Loan Closing Letter
A Swiss law-governed formal letter confirming loan closing, satisfaction of conditions precedent, and documenting key terms and disbursement details.
Letter Of Support
A Swiss-law governed formal document expressing commitment of support (financial, operational, or strategic) from one party to another, outlining specific terms and conditions of the support offered.
Letter Of Reservation
A Swiss-law governed document establishing the terms for reserving a property or asset, typically used as a preliminary step before a full purchase agreement.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.