Extension Of Time Letter
"I need an Extension of Time Letter for our Rotterdam harbor construction project, requesting a 45-day extension due to unprecedented flooding in March 2025 that prevented access to the construction site."
1. Recipient Details: Full name, title, company and address of the recipient
2. Reference Information: Project name, contract reference number, relevant dates
3. Subject Line: Clear indication that this is an Extension of Time Request
4. Contract Reference: Specific reference to relevant contract clauses that permit time extensions
5. Delay Event Description: Detailed description of the event(s) causing the delay
6. Impact Analysis: Explanation of how the delay event affects the project timeline
7. Time Extension Request: Specific amount of additional time being requested with end date adjustment
8. Supporting Evidence Summary: Brief overview of the key evidence supporting the request
9. Closing and Signature: Formal closing, signature block and contact information
1. Mitigation Measures: Description of steps taken or proposed to minimize the delay impact - include when significant mitigation efforts have been made
2. Cost Implications: Summary of any cost impacts related to the delay - include when there are associated cost claims
3. Concurrent Delays: Analysis of any concurrent delays - include when there are overlapping delay events
4. Updated Programme: Reference to revised project schedule - include for complex projects or significant delays
1. Appendix A - Delay Event Timeline: Chronological sequence of events related to the delay
2. Appendix B - Progress Records: Relevant progress reports, photographs, or site records
3. Appendix C - Correspondence: Copies of relevant previous correspondence about the delay event
4. Appendix D - Programme Analysis: Detailed programme analysis showing delay impact
5. Appendix E - Weather Records: Weather data if delay is weather-related
6. Appendix F - Technical Documentation: Technical documents, drawings or specifications relevant to the delay
Authors
Contract
Critical Path
Delay Event
Extension of Time
Force Majeure
Original Programme
Practical Completion
Principal/Client
Project
Revised Completion Date
Site
UAV 2012
Works
Working Day
Excusable Delay
Concurrent Delay
Mitigation Measures
Programme
Progress Records
Substantial Completion
Time Impact Analysis
Variation Order
Contract Reference
Delay Notification
Cause of Delay
Time Impact Assessment
Extension Request
Supporting Evidence
Programme Impact
Mitigation Measures
Cost Implications
Legal Basis
Contract Compliance
Time Calculation
Progress Status
Resource Impact
Remedial Actions
Notice Requirements
Documentation Reference
Construction
Infrastructure
Real Estate Development
Civil Engineering
Industrial Construction
Commercial Construction
Residential Construction
Marine Construction
Energy
Transportation
Public Works
Utilities
Legal
Project Management
Construction
Commercial
Planning
Contract Administration
Risk Management
Quality Assurance
Document Control
Project Controls
Site Operations
Project Manager
Construction Manager
Contract Manager
Site Manager
Project Director
Claims Manager
Planning Engineer
Construction Legal Counsel
Commercial Manager
Project Control Manager
Risk Manager
Document Controller
Quality Assurance Manager
Construction Supervisor
Project Planner
Find the exact document you need
Industrial Attachment Application Letter
A formal application letter used in the Netherlands for students seeking industrial attachment positions, complying with Dutch educational and labor regulations.
Letter To Discontinue Service To Client
A formal notice under Dutch law to terminate service provision to a client, including termination details and final obligations.
Letter For Financial Assistance
A Dutch-law governed formal letter confirming terms and conditions of financial assistance, compliant with Dutch financial regulations and civil code requirements.
Cover Letter For Scholarship Application
A formal scholarship application cover letter compliant with Dutch educational regulations and EU standards, serving as the applicant's primary introduction and scholarship request.
Application For Salary Certificate
A Dutch-compliant official document verifying an employee's salary and employment status, issued by employers for various administrative and financial purposes.
Application For Experience Certificate
A formal request document under Dutch law for obtaining an employment experience certificate (getuigschrift) from a current or former employer.
Termination Mail To Employee
A formal employment termination notice compliant with Dutch employment law, including termination details and final arrangements.
Cash Advance Request Letter
A formal letter used in the Netherlands to request and document temporary advance payments from an organization, complying with Dutch financial regulations and company policies.
Authorization Letter For Claiming Salary
A Dutch law-compliant authorization letter enabling a designated person to collect salary on behalf of an employee in the Netherlands.
Authorization Letter For Claiming Money
A Dutch law-compliant authorization letter empowering a representative to claim or collect money on behalf of an authorizer.
Attachment Application Letter
A formal Dutch job application letter that introduces a candidate and their qualifications to a potential employer, compliant with Netherlands employment regulations.
Application Letter For Cashier
A formal job application letter for cashier positions in the Netherlands, following Dutch employment practices and business letter conventions.
Application Letter For A Job In A Supermarket
A formal job application letter for supermarket positions in the Netherlands, following Dutch business practices and employment regulations.
Application For Recommendation Letter
A Dutch-compliant formal request document for obtaining a professional or academic recommendation letter, structured according to Netherlands privacy and personal data protection requirements.
Letter Of Commendation
A formal Dutch-compliant document recognizing exceptional performance or achievements, typically used in professional contexts in the Netherlands.
Application Letter For Learnership
A formal application letter used in the Netherlands for seeking learnership positions, combining practical work experience with educational training under Dutch employment and education law.
Leave Application Letter
A formal document used in the Netherlands to request and document employee leave, ensuring compliance with Dutch employment law and company policies.
Contract Renewal Letter
A formal document under Dutch law used to extend an existing contract, specifying renewal terms and any modifications to the original agreement.
Guarantor Letter
A Dutch law-governed letter establishing a guarantee commitment where one party agrees to fulfill another party's obligations if they default.
Medical Leave Of Absence Letter
A formal document used in the Netherlands to officially record and communicate an employee's medical leave, ensuring compliance with Dutch employment law and privacy regulations.
Personal Character Reference Letter
A Dutch-compliant formal letter providing testimony about an individual's character and personal qualities, adhering to local privacy laws and GDPR requirements.
Vacation Leave Letter For Personal Reason
A formal vacation leave request letter compliant with Dutch employment law, used by employees to request time off for personal reasons.
Thank You Mail For Promotion
A formal thank you communication under Dutch law from a promoted employee to management/HR, acknowledging the promotion and expressing gratitude.
Loan Rejection Letter
A legally compliant Dutch financial document communicating the rejection of a loan application, including decision rationale and applicant rights under Dutch law.
Letter Of Assistance
A Dutch law-governed formal document establishing terms for providing specific support or assistance between parties.
Letter For Financial Support
A Dutch-law governed formal declaration where a guarantor commits to providing financial support to a beneficiary, typically used for immigration, education, or administrative purposes.
Leave Approval Mail To Manager
A standardized leave request and approval email template compliant with Dutch employment law, facilitating formal leave documentation between employees and management.
Joining Letter After Maternity Leave
A Dutch law-compliant document confirming arrangements for an employee's return to work after maternity leave, including terms and conditions of the return.
Emergency Leave Letter For Mother Sick
A formal letter requesting emergency leave under Dutch law due to mother's illness, complying with WAZO regulations and outlining leave details and work arrangements.
Company Experience Letter
A formal Dutch employment document that verifies an individual's work history and experience with a company, governed by Dutch employment law and GDPR requirements.
Authorization Letter To Receive Money
A Dutch law-compliant authorization letter enabling a designated person to receive money on behalf of the authorizer.
Authorization Letter To Collect Cheque
A Dutch law-compliant authorization letter empowering a representative to collect a cheque on behalf of the principal, meeting all necessary banking and legal requirements.
Authorization Letter To Claim Cheque
A Dutch law-compliant authorization letter enabling a designated person to claim or cash a cheque on behalf of the cheque's owner.
Bank Account Opening Request Letter
A formal request letter for opening a bank account in the Netherlands, complying with Dutch banking regulations and EU directives.
Volunteer Application Letter
A formal volunteer application document used in the Netherlands to express interest in volunteer positions, compliant with Dutch volunteer regulations and privacy laws.
Thank You Letter To Customer For Their Support
A Dutch-compliant formal business letter expressing gratitude to customers for their business or loyalty, following Netherlands business communication standards and GDPR requirements.
Simple Payment Request Letter
A formal payment request document under Dutch law used to remind debtors of their payment obligations and request settlement of outstanding amounts.
Reference Letter For Visa Application
A formal supporting document for visa applications that complies with Dutch legal requirements and immigration standards, provided by a qualified referee to endorse a visa applicant.
Cover Letter For Management Trainee
A formal application document used in the Dutch job market to introduce a candidate for a management trainee position, following local business communication standards and regulations.
Banking Cover Letter
A formal banking document under Dutch law that serves as an accompanying letter for banking communications, transactions, or applications within the Netherlands' financial system.
Authorization Letter To Collect Documents On My Behalf
A Dutch legal document authorizing a designated person to collect specific documents on behalf of another individual, governed by the Dutch Civil Code.
Application Letter For Fuel Attendant Without Experience
A Dutch-compliant application letter template for entry-level fuel attendant positions, designed for candidates with no prior experience in the Netherlands.
Thank You For Your Service Letter
A formal letter under Dutch employment practices expressing gratitude to departing employees, combining professional acknowledgment with personal appreciation.
Salary Certificate For Bank Loan
A Dutch-compliant employer-issued document certifying employment status and income details for bank loan purposes.
Bank Account Opening Letter For Employee
A Dutch-compliant employer letter to bank requesting account opening for new employee, meeting local banking and employment regulations.
Letter Of Absence From Work Due To Family Emergency
A formal Dutch-law compliant letter notifying an employer of an employee's need for immediate absence due to a family emergency.
Referral Letter For Employee
A Dutch law-compliant employment reference letter providing professional assessment of an employee's work history and performance.
New Hire Welcome Letter
A Dutch-law compliant welcome letter that provides new employees with essential employment information and practical details for starting their new position.
Letter To Bank For Change Of Address
A formal letter used in the Netherlands to notify banks of an address change, complying with Dutch banking regulations and privacy laws.
Extension Of Time Letter
A formal request letter under Dutch law seeking extension of project completion time due to delays, including justification and supporting evidence.
Application Letter For Nursing Job
A formal nursing job application letter compliant with Dutch healthcare sector requirements and business correspondence standards.
Volunteer Reference Letter
A formal document under Dutch law that verifies and endorses a volunteer's service, skills, and character for future opportunities.
Leave Letter For Personal Reason
A formal letter requesting personal leave under Dutch employment law, including leave duration, reason, and work handover arrangements.
Letter Asking For Financial Assistance
A formal request for financial assistance compliant with Dutch legal requirements, used to seek financial support from various entities in the Netherlands.
Authorization Letter For Scholarship
A Dutch law-compliant authorization letter enabling a designated representative to handle scholarship-related matters on behalf of the authorizing party.
Salary Transfer Letter To Bank
A Dutch-compliant authorization letter enabling employers to transfer employee salaries directly to specified bank accounts, adhering to Netherlands banking and employment regulations.
Emergency Leave Letter
A formal letter used in the Netherlands to request and document emergency leave from employment, complying with Dutch labor law requirements.
Letter Offering Employment
A formal employment offer letter compliant with Dutch law that outlines key employment terms and conditions for prospective employees in the Netherlands.
Letter Of Counseling
A formal document under Dutch law used to address employee performance or conduct issues, outline improvement requirements, and document the counseling process.
Authorization Letter For Claiming Documents
A Dutch law-compliant formal letter authorizing a designated person to collect or claim specific documents on behalf of the authorizer.
Thank You Letter For Funding Support
A formal Dutch-compliant letter acknowledging receipt of funding support and expressing gratitude, while meeting relevant regulatory requirements.
Proof Of Payment Letter
A Dutch law-compliant formal document confirming receipt and processing of a specific payment, including essential transaction details and serving as legal verification of payment completion.
Maternity Letter To Employer
A formal letter template for Dutch employees to notify employers of pregnancy and request statutory maternity leave under Netherlands labor law.
Leave Of Absence Letter For Personal Reasons
A formal document used in the Netherlands to request and document temporary absence from work for personal reasons, complying with Dutch employment law.
Job Registration Letter
A Dutch-law governed document that formally registers and confirms an employee's position and basic employment terms in the Netherlands.
Internal Transfer Letter
A Dutch law-compliant document formalizing an employee's internal transfer within an organization, detailing new role specifications and modified employment terms.
Holiday Application Letter
A formal request document for planned leave from work under Dutch employment law, including vacation dates, duration, and work coverage arrangements.
Community Service Letter
A Dutch legal document that formalizes community service arrangements, specifying terms, conditions, and obligations under Netherlands law.
Change Of Address Letter
A formal notification document used in the Netherlands to inform organizations about a change in residential or business address, complying with Dutch address registration requirements.
Authorization Letter For Withdrawal Of Savings
A Dutch law-compliant authorization letter enabling a designated person to withdraw funds from a savings account, subject to specified conditions and banking regulations.
Application For Annual Leave Letter
A formal leave request document used in the Netherlands to apply for statutory annual leave, complying with Dutch labor law requirements.
Thank You Letter To Boss For Support During Difficult Times
A formal Dutch business letter expressing gratitude to a supervisor for their support during challenging times, following Dutch business communication standards and privacy regulations.
Letter Of Transfer Of Ownership
A formal Dutch law document that officially transfers ownership rights from one party to another, including essential transfer details and complying with Dutch Civil Code requirements.
Payment Received Letter
A Dutch law-governed formal acknowledgment letter confirming receipt of payment, serving as legal proof of payment transfer.
Formal Application Letter
A formal job application letter compliant with Dutch business and employment regulations, serving as an official expression of interest in a professional position.
Job Application Letter For Accountant
A formal job application letter for an accountant position, conforming to Dutch professional standards and business conventions.
Loan Request Letter
A formal loan application letter compliant with Dutch law, used to request funding from financial institutions while outlining key loan terms and borrower information.
Letter Of Financial Support For Visa
A Dutch-law governed formal guarantee letter where a sponsor commits to providing financial support for a visa applicant during their stay in the Netherlands.
Clearance Letter For Employee
A Dutch-law compliant document confirming an employee's employment history and professional standing with their employer.
Car Booking Cancellation Letter
A formal document under Dutch law used to cancel a vehicle rental booking, outlining the cancellation details and refund requests in compliance with the Dutch Civil Code.
Booking Cancellation Letter
A Dutch law-compliant formal letter template for cancelling bookings or reservations, including essential booking details and cancellation terms.
To Whom It May Concern Letter Of Financial Support
A Dutch law-governed formal declaration of financial support commitment, typically used for immigration, education, or official purposes requiring proof of financial backing.
Tender Application Letter
A formal letter expressing interest and commitment to participate in a Dutch public tender process, governed by Netherlands procurement law and EU directives.
Loan Letter
A Dutch law-governed letter document establishing legally binding loan terms and conditions, including amount, interest, repayment schedule, and security requirements.
Loan Application Letter
A formal loan request document compliant with Dutch banking regulations and financial laws, used to apply for credit from financial institutions in the Netherlands.
Letter Of Employment Verification
A Dutch-compliant formal document confirming an individual's employment status and details, issued by employers in the Netherlands.
Authorization Letter For Processing Documents
A Dutch-law governed authorization letter that formally empowers a designated party to handle and process specific documents on behalf of the authorizing party.
Authorization Letter For Bank
A Dutch law-governed document authorizing a designated person or entity to conduct specific banking transactions on behalf of an account holder.
Probation Extension Letter
A Dutch law-compliant formal letter extending an employee's probationary period, outlining new terms and performance expectations.
Loan Confirmation Letter
A Dutch law-governed letter confirming loan approval and documenting essential terms and conditions of the lending arrangement.
Job Employment Letter
A formal employment contract under Dutch law outlining essential terms and conditions of employment, complying with Netherlands labor legislation.
Credit Card Cancellation Letter
A formal letter compliant with Dutch law for terminating a credit card agreement with a financial institution.
Authorization Letter To Collect Certificate
A Dutch law-compliant authorization letter empowering a designated person to collect a certificate on behalf of another individual.
Loan Cancellation Letter
A Dutch law-governed document that formally cancels an existing loan agreement and releases the borrower from their repayment obligations.
Remittance Letter
A Dutch-law governed document that formally authorizes and documents the transfer of funds between parties, ensuring compliance with Dutch financial regulations and banking laws.
Certificate Of Employment Letter
A formal Dutch employment verification document that confirms an individual's employment status and details, complying with Dutch employment law and GDPR requirements.
Credit Reference Letter
A formal banking document under Dutch law that provides information about a client's creditworthiness and banking relationship status.
Letter Of Authorization
A Dutch law-governed document that formally delegates specific powers from one party to another, enabling authorized representation under the Dutch Civil Code.
Authorization Letter To Represent On Behalf Of Company
A Dutch law-governed document authorizing an individual or entity to legally represent and act on behalf of a company in specified matters.
Scholarship Application Letter
A formal application letter for academic funding in the Netherlands, complying with Dutch educational and privacy regulations.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.