Method Statement For Demolition Of Concrete Slab
"I need a Method Statement For Demolition Of Concrete Slab for removing a 500m² industrial foundation slab at our manufacturing facility in Johannesburg, which must be completed during the planned shutdown in March 2025 with minimal disruption to adjacent operational areas."
1. Project Information: Details of the project including site location, client details, and scope of demolition work
2. Document Control: Version control, document owner, and revision history
3. Responsible Persons: Names and contact details of key personnel including site supervisor, safety officer, and emergency contacts
4. Site Description: Detailed description of the concrete slab, its dimensions, location, and surrounding environment
5. Risk Assessment: Identification and assessment of potential hazards and risks associated with the demolition work
6. Control Measures: Detailed safety measures and controls to mitigate identified risks
7. Equipment and Tools: List of equipment, tools, and machinery to be used in the demolition process
8. PPE Requirements: Specification of required Personal Protective Equipment for all workers
9. Demolition Methodology: Step-by-step procedure for the demolition process
10. Environmental Management: Measures for dust control, noise management, and waste handling
11. Emergency Procedures: Emergency response plans and evacuation procedures
12. Waste Management: Procedures for handling, sorting, and disposing of demolition waste
1. Temporary Works: Details of any temporary support structures or protection required, used when demolition involves structural elements
2. Traffic Management Plan: Required when demolition work affects public roads or access ways
3. Noise Management Plan: Detailed plan for noise control, required in noise-sensitive areas or during restricted hours
4. Asbestos Management: Procedures for handling asbestos if present in or around the concrete slab
5. Service Isolation: Procedures for disconnecting and protecting services, required when live services are present
6. Vibration Monitoring: Required when demolition work could affect adjacent structures
7. Public Protection Measures: Additional safety measures required when work is conducted near public areas
1. Risk Assessment Matrix: Detailed risk assessment tables and matrices
2. Site Layout Plan: Drawings showing the demolition area, access points, and safety zones
3. Equipment Certificates: Copies of inspection certificates for major equipment and machinery
4. Training Records: Certificates and qualifications of key personnel
5. Emergency Contact List: Comprehensive list of emergency contacts and procedures
6. Environmental Management Forms: Forms for recording dust monitoring, noise levels, and waste disposal
7. Toolbox Talk Templates: Templates for daily safety briefings and team communications
8. Inspection Checklists: Daily and weekly safety inspection checklists
Authors
Competent Person
Construction Work
Concrete Slab
Demolition Work
Emergency Procedures
Environmental Control Measures
Fall Protection Plan
Hazard
Health and Safety File
Health and Safety Plan
Hot Work
Incident
Load Bearing Structure
Method Statement
Notifiable Works
Personal Protective Equipment (PPE)
Principal Contractor
Risk Assessment
Safe Working Load
Safety Data Sheet
Site
Site Supervisor
Structural Engineer
Temporary Works
Work Permit
Working at Height
Workplace
Zone of Influence
Construction Regulations
Demolition Area
Exclusion Zone
Plant and Equipment
Waste Management Plan
Site Specific Requirements
Document Control
Site Access and Security
Health and Safety
Risk Assessment
Environmental Protection
Equipment and Resources
Personnel Requirements
Demolition Methodology
Emergency Procedures
Waste Management
Quality Control
Notification Requirements
Monitoring and Supervision
Compliance
Reporting Requirements
Construction
Civil Engineering
Mining
Industrial Manufacturing
Property Development
Infrastructure Development
Commercial Real Estate
Facilities Management
Waste Management
Environmental Services
Operations
Health and Safety
Project Management
Construction
Environmental Compliance
Quality Assurance
Risk Management
Engineering
Site Operations
Compliance
Construction Manager
Health and Safety Manager
Site Supervisor
Project Manager
Environmental Compliance Officer
Demolition Specialist
Civil Engineer
Structural Engineer
Risk Assessment Officer
Construction Safety Officer
Operations Manager
Quality Control Manager
Site Engineer
Construction Director
Compliance Manager
Find the exact document you need
Method Statement For Cable Glanding And Termination
A South African regulatory-compliant technical document detailing procedures and safety requirements for cable glanding and termination operations.
Contractor Method Statement
A South African regulatory document that details safe work procedures and risk management for specific construction activities, complying with OHSA requirements.
Method Statement For Cutting Concrete Slab
A South African-compliant technical document outlining methodology and safety procedures for concrete slab cutting operations, aligned with local OHS regulations.
Site Specific Risk Assessment And Method Statement
A South African regulatory compliance document that details site-specific hazards, risk assessments, and safe work procedures as required by OHS Act and Construction Regulations.
Method Statement For Column Formwork
A technical document outlining procedures and safety requirements for column formwork installation in South African construction projects, compliant with local regulations and SANS standards.
Method Statement For Demolition Of Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab demolition in accordance with South African regulations.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.