Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Contractor Method Statement
"I need a Contractor Method Statement for a high-rise building demolition project in Cape Town, starting March 2025, that will involve extensive use of heavy machinery and require particular attention to dust control and noise management in an urban environment."
1. Project Information: Identifies the project, location, client details, and contractor information
2. Scope of Work: Detailed description of the specific construction activities covered by this method statement
3. Resources Required: Lists personnel, equipment, materials, and tools needed for the work
4. Risk Assessment: Identification of hazards, risk evaluation, and control measures
5. Safety Measures: Specific safety procedures, PPE requirements, and emergency protocols
6. Work Methodology: Step-by-step description of how the work will be carried out
7. Quality Control: Quality assurance measures and inspection requirements
8. Environmental Protection: Measures to protect the environment and manage waste
9. Emergency Procedures: Emergency response plans and contact information
10. Sign-off Section: Approval signatures from relevant parties and date of implementation
1. Site-Specific Requirements: Additional requirements unique to the specific construction site, used when working in special environments
2. Permits and Licenses: Details of required permits and licenses, included when special authorizations are needed
3. Training Requirements: Specific training needs for personnel, included when specialized skills are required
4. Interface Management: Procedures for managing work interfaces with other contractors, used in complex projects with multiple contractors
5. Weather Considerations: Special procedures for adverse weather conditions, included for weather-sensitive operations
6. Temporary Works: Details of temporary structures or supports, included when temporary works are required
7. Traffic Management: Traffic control measures, included when work affects public or site traffic
1. Risk Assessment Matrix: Detailed risk assessment tables and matrices
2. Equipment Specifications: Technical specifications of major equipment to be used
3. Safety Data Sheets: MSDS for any hazardous materials being used
4. Site Layout Plans: Drawings showing work areas, access points, and safety features
5. Inspection Checklists: Pre-start and ongoing inspection forms
6. Training Records: Certificates and qualifications of key personnel
7. Emergency Contact List: List of emergency contacts and response procedures
8. Method Statement Drawings: Technical drawings and sketches illustrating work methods
Authors
Construction Work
Contractor
Principal Contractor
Client
Construction Site
Hazard
Risk
Risk Assessment
Method Statement
Personal Protective Equipment (PPE)
Safe Work Procedure
Construction Supervisor
Health and Safety Officer
Safety Representative
Construction Regulations
Work Area
Emergency Procedures
Incident
OHSA
Site Rules
Temporary Works
Permit to Work
Environmental Impact
Control Measures
Construction Plant
Construction Vehicle
Fall Protection Plan
Hazardous Chemical Substance
High-Risk Work
Hot Work
Safety Data Sheet
Work at Height
Working Platform
Site Specific Requirements
Toolbox Talk
Scope of Work
Risk Assessment
Safety Requirements
Work Methodology
Resource Requirements
Equipment Requirements
Personal Protective Equipment
Emergency Procedures
Environmental Protection
Quality Control
Training Requirements
Regulatory Compliance
Site Access
Permits and Licenses
Communication Procedures
Incident Reporting
Waste Management
First Aid
Fire Safety
Traffic Management
Storage and Handling
Inspection Requirements
Sign-off and Approval
Construction
Mining
Civil Engineering
Industrial Manufacturing
Infrastructure Development
Property Development
Oil and Gas
Renewable Energy
Transportation
Telecommunications
Health and Safety
Operations
Project Management
Quality Assurance
Risk Management
Site Operations
Compliance
Technical Services
Construction Operations
Environmental Management
Construction Manager
Health and Safety Manager
Project Manager
Site Supervisor
Risk Assessment Officer
Quality Control Manager
Environmental Compliance Officer
Operations Manager
Construction Director
Safety Representative
Technical Director
Site Engineer
Contract Manager
Compliance Officer
Find the exact document you need
Method Statement For Cable Glanding And Termination
A South African regulatory-compliant technical document detailing procedures and safety requirements for cable glanding and termination operations.
Contractor Method Statement
A South African regulatory document that details safe work procedures and risk management for specific construction activities, complying with OHSA requirements.
Method Statement For Cutting Concrete Slab
A South African-compliant technical document outlining methodology and safety procedures for concrete slab cutting operations, aligned with local OHS regulations.
Site Specific Risk Assessment And Method Statement
A South African regulatory compliance document that details site-specific hazards, risk assessments, and safe work procedures as required by OHS Act and Construction Regulations.
Method Statement For Column Formwork
A technical document outlining procedures and safety requirements for column formwork installation in South African construction projects, compliant with local regulations and SANS standards.
Method Statement For Demolition Of Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab demolition in accordance with South African regulations.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.