Construction SOW
1. Parties: Identification and details of the contractor and client, including company registration numbers (CVR)
2. Background: Context of the construction project and the purpose of the agreement
3. Definitions: Key terms used throughout the document, ensuring alignment with AB 18 terminology
4. Project Scope: Detailed description of the construction work to be performed, including location and general specifications
5. Technical Specifications: Detailed technical requirements and standards for the construction work, referencing applicable Danish building codes
6. Timeline and Milestones: Project schedule, key dates, and completion criteria
7. Price and Payment Terms: Pricing structure, payment schedule, and invoicing requirements
8. Materials and Equipment: Specifications for materials and equipment, including quality standards and compliance requirements
9. Quality Requirements: Quality assurance measures, inspections, and acceptance criteria
10. Health and Safety Requirements: Safety protocols and compliance with Danish Working Environment Act
11. Warranties and Guarantees: Warranty terms and performance guarantees as per Danish law
12. Insurance and Liability: Required insurance coverage and liability provisions
13. Change Management: Procedures for handling changes to scope, timeline, or costs
14. Governing Law and Dispute Resolution: Confirmation of Danish law governance and dispute resolution procedures
1. Environmental Requirements: Specific environmental compliance requirements, used when project has significant environmental impact
2. Subcontractor Management: Requirements for managing subcontractors, included when subcontracting is permitted
3. Site Access and Security: Specific site access protocols, included for projects with special security needs
4. Cultural Heritage Protection: Requirements for projects near protected sites or historical buildings
5. Community Impact Management: Measures to manage community impact, included for projects in densely populated areas
6. Sustainability Requirements: Special sustainability certifications or requirements, included when project aims for specific environmental certifications
7. Innovation and Technology: Special technical or innovative requirements, included for projects using new construction methods
8. Handover and Training: Requirements for operational training and handover, included for complex technical installations
1. Schedule A - Detailed Scope of Work: Comprehensive technical specifications and drawings
2. Schedule B - Project Timeline: Detailed project schedule with all milestones and deadlines
3. Schedule C - Price Breakdown: Detailed pricing structure including unit prices and payment schedule
4. Schedule D - Quality Control Plan: Specific quality control procedures and acceptance criteria
5. Schedule E - Health and Safety Plan: Detailed safety procedures and risk assessments
6. Schedule F - Key Personnel: List of key personnel and their responsibilities
7. Schedule G - Required Permits and Approvals: List of all required regulatory permits and approvals
8. Schedule H - Equipment and Materials Specifications: Detailed specifications for all major equipment and materials
9. Appendix 1 - Technical Drawings: Complete set of technical drawings and plans
10. Appendix 2 - Environmental Management Plan: Environmental protection measures and compliance procedures
11. Appendix 3 - Risk Register: Identified risks and mitigation strategies
12. Appendix 4 - Forms and Templates: Standard forms for reporting, changes, and approvals
Authors
Additional Works
Approved
As-Built Documentation
Building Site
Client
Completion Date
Construction Period
Contractor
Contract Price
Contract Documents
Day
Defects
Deliverables
Design Documentation
Effective Date
Equipment
Force Majeure
Good Industry Practice
Handover
Health and Safety Plan
Key Personnel
Materials
Milestone
Notice
Parties
Payment Schedule
Performance Standards
Permits
Project
Project Manager
Project Schedule
Quality Control Plan
Regulations
Site
Scope of Work
Services
Specifications
Subcontractor
Substantial Completion
Technical Requirements
Variation
Warranty Period
Work
Working Day
Technical Specifications
Project Timeline
Payment Terms
Materials and Equipment
Quality Control
Health and Safety
Environmental Compliance
Site Access and Security
Permits and Approvals
Contractor Obligations
Client Obligations
Project Management
Communication Procedures
Reporting Requirements
Change Management
Risk Management
Subcontracting
Insurance Requirements
Liability
Warranties
Performance Standards
Testing and Inspection
Documentation Requirements
Acceptance Criteria
Handover Procedures
Defects Liability
Force Majeure
Dispute Resolution
Termination
Confidentiality
Intellectual Property
Compliance with Laws
Record Keeping
Audit Rights
Find the exact document you need
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.