Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Method Statement And Risk Assessment For Landscaping
"I need a Method Statement and Risk Assessment for Landscaping for a new luxury hotel development in Dubai, focusing on installation and maintenance of extensive water features and native desert plants, with work scheduled to commence in March 2025."
1. 1. Introduction: Overview of the project scope, objectives, and site location
2. 2. Project Information: Details of the project, key stakeholders, and timeline
3. 3. Scope of Works: Detailed description of landscaping activities to be undertaken
4. 4. Resources: List of personnel, equipment, tools, and materials required
5. 5. Method Statement: Step-by-step procedures for executing landscaping works
6. 6. Risk Assessment: Identification and evaluation of potential hazards and risks
7. 7. Control Measures: Specific measures to mitigate identified risks
8. 8. Safety Procedures: General and specific safety requirements including PPE
9. 9. Environmental Controls: Measures to protect environment and manage waste
10. 10. Emergency Procedures: Response protocols for accidents and emergencies
11. 11. Training Requirements: Required qualifications and training for personnel
12. 12. Monitoring and Supervision: Procedures for work supervision and quality control
1. Noise Management Plan: Required when working in noise-sensitive areas or using loud equipment
2. Traffic Management Plan: Needed when landscaping work affects vehicle or pedestrian traffic
3. Irrigation System Procedures: Include when project involves installation or maintenance of irrigation systems
4. Chemical Handling Procedures: Required when using pesticides, fertilizers, or other chemicals
5. Heritage Protection Measures: Include when working near historical or protected sites
6. Night Work Procedures: Required for projects involving work after daylight hours
1. Schedule A - Risk Assessment Matrix: Detailed risk evaluation tables and scoring system
2. Schedule B - Site Layout Plans: Drawings showing work areas, access points, and safety features
3. Schedule C - Equipment Specifications: Technical details of machinery and tools to be used
4. Schedule D - Material Safety Data Sheets: Safety information for all chemicals and materials
5. Schedule E - Emergency Contact List: Contact details for key personnel and emergency services
6. Schedule F - Inspection Checklists: Forms for daily safety and quality checks
7. Appendix 1 - Training Records: Certificates and qualifications of key personnel
8. Appendix 2 - Method Statement Drawings: Detailed illustrations of specific work procedures
9. Appendix 3 - Environmental Impact Assessment: Analysis of environmental effects and mitigation measures
Authors
Competent Person
Control Measures
COSHH
Dynamic Risk Assessment
Environmental Aspect
Hazard
Heat Stress
HSE
Incident
Job Safety Analysis (JSA)
Landscaping Works
Method Statement
Near Miss
Personal Protective Equipment (PPE)
Project Site
Qualified Person
Residual Risk
Risk Assessment
Risk Rating
Safe System of Work
Safety Data Sheet (SDS)
Site Supervisor
Stakeholder
Stop Work Authority
Task
Task Risk Assessment
Work Area
Work Permit
Working at Height
Irrigation System
Plant Protection
Chemical Application
Green Waste
Midday Break
Site-Specific Risk Assessment
Emergency Response Plan
Environmental Impact
Maintenance Period
Quality Control
Project Information
Risk Assessment
Safety Requirements
Method Statement
Environmental Protection
Emergency Procedures
Personnel Requirements
Equipment and Materials
Quality Control
Site Management
Work Procedures
Control Measures
Training Requirements
Monitoring and Supervision
Environmental Controls
Waste Management
Personal Protective Equipment
Heat Stress Management
Chemical Handling
Incident Reporting
First Aid
Traffic Management
Site Access
Documentation Requirements
Communication Procedures
Inspection Requirements
Real Estate Development
Facilities Management
Construction
Hospitality
Education
Healthcare
Government and Public Spaces
Residential Communities
Commercial Properties
Sports and Recreation
Resort and Tourism
Industrial Parks
Operations
Health Safety and Environment
Quality Assurance
Project Management
Facilities Management
Maintenance
Risk Management
Environmental Compliance
Technical Services
Contract Administration
Landscape Manager
Health and Safety Manager
Project Manager
Operations Director
Site Supervisor
Quality Control Inspector
Risk Assessment Officer
Environmental Compliance Officer
Facilities Manager
Maintenance Manager
Landscape Architect
HSE Coordinator
Operations Manager
Contract Manager
Technical Director
Find the exact document you need
High Level Risk Assessment
UAE-compliant template for conducting comprehensive high-level risk assessments, aligned with federal and emirate-specific regulations.
Modern Slavery Risk Assessment
UAE-compliant template for assessing and documenting organizational exposure to modern slavery risks, aligned with Federal Law No. 51 of 2006 and international standards.
Diesel Coshh Assessment
UAE-compliant health and safety assessment for controlling risks associated with diesel fuel handling and storage in workplace settings.
Baseline Risk Assessment
A UAE-compliant systematic assessment document that identifies, analyzes, and provides control measures for workplace hazards and risks, aligned with OSHAD-SF requirements.
Vulnerability Assessment Matrix
A UAE-compliant security assessment document that systematically identifies and analyzes IT infrastructure vulnerabilities while ensuring alignment with local cybersecurity regulations.
Method Statement And Risk Assessment For Landscaping
A UAE-compliant document detailing landscaping work methodology and risk assessment procedures, incorporating local safety and environmental requirements.
Cloud Computing Risk Assessment
A UAE-compliant template for assessing risks associated with cloud computing implementations, ensuring alignment with local data protection and cybersecurity regulations.
Hospitality Risk Assessment
UAE-compliant risk assessment template for hospitality establishments, addressing operational, safety, and regulatory requirements specific to the Emirates.
Hazard Identification Form
A UAE-compliant workplace hazard identification and assessment form for documenting and managing workplace safety risks under UAE labor and safety regulations.
Outside Catering Risk Assessment
UAE-compliant risk assessment template for outdoor catering operations, addressing food safety, environmental, and staff safety requirements under UAE regulations.
Procurement Risk Assessment Matrix
A comprehensive procurement risk assessment tool aligned with UAE federal procurement laws and regulations, designed to identify, evaluate, and mitigate procurement-related risks.
Yard Risk Assessment
UAE-compliant template for systematic yard risk assessment, incorporating federal and emirate-specific safety requirements.
Vulnerable Person Risk Assessment
UAE-compliant risk assessment template for evaluating and protecting vulnerable individuals, aligned with federal laws and regulations.
Bow Tie Risk Assessment
UAE-compliant bow tie risk assessment template for systematic hazard identification and control measure documentation, aligned with federal HSE regulations.
Plumbing Risk Assessment
UAE-compliant template for conducting systematic plumbing risk assessments in buildings and facilities, aligned with federal and emirate-specific regulations.
Asset Criticality Assessment
UAE-compliant template for systematic assessment of asset criticality, incorporating federal and emirate-level requirements for comprehensive asset evaluation and risk assessment.
Scaffold Risk Assessment And Method Statement
UAE-compliant safety and methodology document for managing scaffold-related risks and procedures in accordance with Federal Law No. 8 of 1980 and OSHAD requirements.
Financial Crime Risk Assessment
UAE-compliant template for systematic assessment of financial crime risks in financial institutions, aligned with Federal Decree-Law No. 20 of 2018.
Training Risk Assessment
UAE-compliant template for assessing and managing risks associated with training activities, aligned with federal and local safety regulations.
HR Risk Assessment
A UAE-compliant HR Risk Assessment Template for systematic evaluation and management of human resource-related risks within organizations operating under UAE labor laws.
Solar Pv Risk Assessment
UAE-compliant risk assessment template for solar PV installations, covering design, installation, operation, and maintenance risks under UAE federal and emirate regulations.
Bank Compliance Risk Assessment
UAE-compliant template for banks to assess and monitor compliance risks in accordance with Central Bank regulations and international standards.
Data Privacy Risk Assessment
UAE-compliant template for assessing data privacy risks and ensuring compliance with Federal Decree-Law No. 45 of 2021 and related regulations.
Tile Manual Handling Risk Assessment
UAE-compliant risk assessment document for safe manual handling of tiles, aligned with Federal Law No. 8 of 1980 and local safety regulations.
Startup Risk Assessment
A UAE-compliant risk assessment framework for startups, covering business, regulatory, and operational risks in both mainland and free zone contexts.
Standard Risk Assessment Matrix
UAE-compliant risk assessment matrix for systematic evaluation and control of workplace hazards, aligned with federal safety regulations and international standards.
Site Specific Risk Assessment And Method Statement
A UAE-compliant document that combines risk assessment and method statements for safe work procedures on specific sites, meeting local safety regulations and standards.
Simple Risk Assessment Matrix
A UAE-compliant risk assessment tool for identifying, evaluating, and controlling workplace hazards in accordance with federal safety regulations.
Road Risk Assessment
UAE-compliant template for systematic road risk assessment, aligned with federal traffic laws and RTA guidelines.
Risk Maturity Assessment
UAE-compliant template for assessing organizational risk management maturity levels and identifying areas for improvement.
Risk Assessment Medical Device
A UAE-compliant risk assessment template for medical devices, aligned with Federal Law No. 8 of 2019 and international standards.
Remote Deposit Capture Risk Assessment
A UAE-compliant risk assessment template for Remote Deposit Capture services, aligned with Central Bank regulations and banking standards.
Raw Material Supplier Risk Assessment
A UAE-compliant template for conducting comprehensive risk assessments of raw material suppliers, incorporating local regulatory requirements and international best practices.
Radiography Risk Assessment
UAE-compliant template for assessing and managing risks associated with radiographic operations, aligned with FANR regulations and federal requirements.
Preliminary Risk Assessment Audit
A UAE-compliant preliminary assessment document that identifies and evaluates organizational risks, control effectiveness, and recommended mitigation strategies.
Pre Tender Risk Assessment
A UAE-compliant risk assessment document for evaluating potential risks and feasibility before participating in a tender process, ensuring alignment with local regulations and business requirements.
Patient Moving And Handling Risk Assessment
A UAE-compliant template for assessing risks in patient moving and handling procedures, ensuring safety standards in healthcare settings.
Pallet Truck Risk Assessment
UAE-compliant risk assessment template for pallet truck operations, addressing safety requirements under UAE Federal Labor Law and OSHAD guidelines.
OHS Assessment
UAE-compliant occupational health and safety assessment template for systematic workplace safety evaluation and risk management.
Office Health And Safety Risk Assessment
UAE-compliant office health and safety risk assessment template aligned with Federal Law No. 8 of 1980 and local safety regulations.
Occupied Building Risk Assessment
UAE-compliant template for conducting comprehensive risk assessments in occupied buildings, aligned with Federal Laws and Civil Defense requirements.
Occupational Health And Safety Risk Assessment
UAE-compliant template for conducting workplace health and safety risk assessments, aligned with federal labor laws and emirate-specific safety regulations.
Nursery Childcare Risk Assessment
UAE-compliant risk assessment template for nursery and childcare facilities, ensuring comprehensive safety and regulatory adherence under UAE Federal Laws.
New Product Risk Assessment
UAE-compliant template for systematic risk assessment of new products, ensuring regulatory compliance and safety standards.
Nail Salon Risk Assessment
A UAE-compliant risk assessment template for nail salons, addressing health, safety, and operational risks under UAE federal and municipal regulations.
Manual Handling Tile Risk Assessment
UAE-compliant risk assessment template for manual handling of tiles, aligned with Federal Labor Law requirements and safety regulations.
Compliance Risk Assessment Questionnaire
UAE-specific compliance risk assessment tool for evaluating organizational adherence to local regulations and identifying potential compliance risks.
Care Home Risk Assessment
UAE-compliant risk assessment template for care homes, incorporating federal and emirate-level healthcare requirements and safety standards.
Workplace Assessment
UAE-compliant workplace assessment template for evaluating workplace safety conditions and hazards under UAE Federal Labor Law.
Manual Handling Risk Assessment Tool
UAE-compliant risk assessment tool for evaluating and managing manual handling risks in the workplace, aligned with Federal Labor Law requirements.
Manual Handling Assessment Chart
A UAE-compliant technical document for assessing and managing risks associated with workplace manual handling operations, aligned with Federal Labor Law requirements.
Lift Plan Risk Assessment
A UAE-compliant risk assessment document for lifting operations, outlining hazards, controls, and safety procedures in accordance with federal and local regulations.
Last Minute Risk Assessment
UAE-compliant template for conducting immediate pre-task safety evaluations, designed to identify and mitigate workplace risks in accordance with local safety regulations.
Laser Risk Assessment
A UAE-compliant template for comprehensive laser risk assessment and safety management, aligned with federal regulations and international standards.
Infrastructure Risk Assessment
A UAE-compliant template for comprehensive infrastructure risk assessment, incorporating federal and emirate-specific regulatory requirements.
Glass And Hard Plastic Risk Assessment
UAE-compliant risk assessment template for evaluating and managing glass and hard plastic hazards in workplace settings.
Financial Statement Risk Assessment
A UAE-compliant risk assessment document analyzing financial statement risks and controls under UAE federal laws and IFRS standards.
Farm Risk Assessment
UAE-compliant farm risk assessment template for comprehensive evaluation and management of agricultural operation hazards.
Factory Risk Assessment
A UAE-compliant template for systematic assessment and documentation of workplace hazards and safety controls in factory environments.
Employee Health Risk Assessment
UAE-compliant template for conducting and documenting employee health risk assessments, ensuring workplace safety and legal compliance.
Emergency Preparedness Risk Assessment
A UAE-compliant assessment document analyzing emergency risks and preparedness measures, aligned with federal and local emergency management regulations.
Emergency Lighting Risk Assessment
UAE-compliant template for conducting emergency lighting risk assessments, ensuring compliance with local safety codes and Civil Defense requirements.
Document Control Risk Assessment
A UAE-compliant risk assessment framework analyzing document control processes, identifying vulnerabilities, and providing risk mitigation recommendations.
Display Screen Assessment
UAE-compliant template for assessing display screen equipment setups and workplace ergonomics, aligned with Federal Labor Law requirements.
Desk Risk Assessment
A UAE-compliant template for conducting systematic desk-based risk assessments, aligned with federal and emirate-level safety regulations.
Criticality Assessment Matrix
A UAE-compliant framework for assessing and categorizing the criticality of business components and systems, aligned with federal laws and risk management requirements.
Crane Risk Assessment
UAE-compliant crane operations risk assessment template incorporating federal and emirate-level safety requirements and operational guidelines.
Classroom Risk Assessment
UAE-compliant classroom risk assessment template for educational institutions, aligned with federal and emirate-level safety regulations.
Business Risk Assessment Questionnaire
A UAE-compliant questionnaire for comprehensive business risk assessment and documentation, aligned with federal and emirate-specific regulations.
Business Continuity Assessment
UAE-compliant template for assessing organizational business continuity preparedness and risk management capabilities.
Asset Based Risk Assessment
UAE-compliant template for systematic asset risk assessment, aligned with federal laws and regulatory requirements.
Assessment Matrix
UAE-compliant assessment matrix template for standardized evaluation of performance, compliance, or capabilities across organizations.
Asset Management Risk Assessment
UAE-compliant risk assessment template for asset management operations, aligned with Central Bank and SCA regulations.
Country Risk Assessment
A structured template for assessing business and operational risks in the UAE market, incorporating analysis of federal, emirate-level, and free zone regulations.
5x5 Risk Assessment
UAE-compliant 5x5 risk assessment template for systematic workplace hazard identification and risk evaluation, aligned with local safety regulations.
Display Screen Equipment Risk Assessment
UAE-compliant risk assessment template for evaluating display screen equipment usage and workstation safety in accordance with UAE Federal Labor Law.
Biosecurity Risk Assessment
UAE-compliant template for conducting comprehensive biosecurity risk assessments, aligned with federal regulations and international standards.
Bank Fraud Risk Assessment
A UAE-compliant template for conducting comprehensive fraud risk assessments in banking institutions, aligned with CBUAE regulations and international best practices.
Petrol Coshh Assessment
A UAE-compliant hazard assessment document for managing risks associated with petrol handling and storage in the workplace, meeting federal safety regulations.
Pre Construction Risk Assessment
A UAE-compliant template for systematic pre-construction risk assessment and management, aligned with federal and emirate-level construction safety regulations.
First Aid Needs Assessment
UAE-compliant template for conducting workplace first aid needs assessments, ensuring regulatory compliance and appropriate first aid provision.
Excavation Risk Assessment And Method Statement
UAE-compliant risk assessment and methodology document for safe excavation operations, following federal and municipal safety regulations.
Daily Risk Assessment
A UAE-compliant daily risk assessment template for systematic workplace hazard identification and risk control, aligned with Federal Law No. 8 of 1980 and local safety regulations.
Fire Department Risk Assessment
UAE-compliant fire risk assessment template aligned with UAE Fire and Life Safety Code requirements for systematic evaluation of fire safety measures and risks.
HVAC Risk Assessment
UAE-compliant HVAC risk assessment template for systematic evaluation and management of HVAC system risks in accordance with local regulations.
Construction Site Fire Risk Assessment
UAE-compliant template for conducting comprehensive fire risk assessments on construction sites, meeting federal and emirate-specific safety regulations.
Process Risk Assessment
A UAE-compliant template for systematic process risk assessment, aligned with federal and emirate-specific regulations for comprehensive risk management.
Dust Risk Assessment
UAE-compliant template for systematic assessment and control of workplace dust hazards, aligned with federal labor laws and emirate-specific safety regulations.
Catering Risk Assessment
UAE-compliant risk assessment template for catering operations, covering food safety, workplace safety, and environmental health requirements under UAE Federal Law.
Ppe Hazard Assessment
A UAE-compliant template for assessing workplace hazards and determining appropriate PPE requirements in accordance with local safety regulations.
Technical Risk Assessment
UAE-compliant technical risk assessment template for comprehensive evaluation and mitigation of technical risks across industrial operations.
Environmental Risk Assessment Matrix
A UAE-compliant environmental risk assessment tool for identifying, evaluating, and managing environmental impacts in accordance with federal and emirate-level regulations.
Flooring Risk Assessment
A UAE-compliant template for systematic assessment of flooring-related risks and safety measures across various building types and environments.
Procurement Risk Assessment
UAE-compliant template for systematic procurement risk assessment, aligned with Federal Law No. 8 of 2017 and local regulations.
Individual Risk Assessment
UAE-compliant template for conducting individual workplace risk assessments, aligned with federal labor laws and safety regulations.
IT Risk Assessment Policy
UAE-compliant IT Risk Assessment Policy establishing framework for identifying and managing IT risks while meeting local regulatory requirements.
Design Risk Assessment
A UAE-compliant assessment document that identifies, analyzes, and provides mitigation measures for design-related risks in construction and development projects.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.