Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Risk Assessment And Method Statement
"I need a Risk Assessment and Method Statement for a 15-story residential building construction project in Mumbai, starting March 2025, with particular focus on working at height and crane operations."
1. Document Control Information: Contains document reference number, revision history, and approval status
2. Project Details: Specific information about the project, location, dates, and scope of work
3. Responsible Persons: Details of key personnel including project manager, safety officer, and supervisors
4. Work Description: Detailed description of the work to be carried out, including sequence of operations
5. Resource Requirements: List of personnel, equipment, materials, and tools required for the work
6. Risk Assessment Matrix: Standard risk assessment matrix showing likelihood and severity ratings
7. Hazard Identification: Comprehensive list of all potential hazards associated with the work
8. Risk Evaluation: Assessment of risks associated with each identified hazard
9. Control Measures: Detailed preventive and protective measures for each identified risk
10. Method Statement: Step-by-step procedure for carrying out the work safely
11. Emergency Procedures: Specific emergency response procedures and contact information
12. PPE Requirements: Detailed list of required Personal Protective Equipment
13. Training Requirements: Specific training and competency requirements for personnel
1. Environmental Impact Assessment: Required when work has significant environmental implications
2. Noise Assessment: Needed for works involving high noise levels or in noise-sensitive areas
3. Traffic Management Plan: Required for works affecting public roads or vehicle movements
4. Confined Space Entry Procedures: Necessary when work involves confined space operations
5. Working at Height Procedures: Required for any work conducted at height
6. Lifting Operations: Needed when crane or lifting operations are involved
7. Hazardous Substance Assessment: Required when handling dangerous or hazardous materials
8. Permit to Work Systems: Necessary for high-risk activities requiring specific authorization
1. Risk Assessment Forms: Blank and completed risk assessment forms for specific tasks
2. Equipment Inspection Checklists: Detailed checklists for equipment inspection and maintenance
3. Training Records: Copies of relevant training certificates and competency records
4. Site Layout Plans: Drawings showing work areas, access routes, and emergency exits
5. Emergency Contact Details: List of emergency contacts and first aiders
6. Toolbox Talk Records: Records of safety briefings and toolbox talks
7. Method Statement Briefing Record: Sign-off sheets for worker acknowledgment of RAMS
8. Incident Report Forms: Template forms for reporting accidents and incidents
Authors
Risk
Risk Assessment
Method Statement
Control Measures
Competent Person
Personal Protective Equipment (PPE)
RAMS
Safety Officer
Site Supervisor
Permit to Work
Safe Working Procedure
Emergency Response Plan
Incident
Accident
Near Miss
Risk Matrix
Likelihood
Severity
Residual Risk
Hazardous Substance
Work Area
Safety Data Sheet
Safe System of Work
Toolbox Talk
Standard Operating Procedure
Work at Height
Confined Space
Manual Handling
Hot Work
Dynamic Risk Assessment
COSHH (Control of Substances Hazardous to Health)
First Aid Personnel
Safety Critical Activity
Risk Rating
Preventive Measure
Mitigation Strategy
Safe Access
Safe Egress
Work Equipment
Project Information
Responsibilities
Risk Assessment
Hazard Identification
Control Measures
Method Statements
Emergency Procedures
Personal Protective Equipment
Training Requirements
Environmental Protection
Equipment Requirements
Safe Work Procedures
Monitoring and Review
Communication Procedures
Incident Reporting
First Aid Arrangements
Site Rules
Permit to Work
Compliance Requirements
Construction
Manufacturing
Mining
Oil and Gas
Chemical Processing
Infrastructure Development
Power Generation
Transportation
Telecommunications
Heavy Industry
Warehousing and Logistics
Healthcare Facilities
Waste Management
Marine Operations
Health and Safety
Operations
Project Management
Quality Assurance
Risk Management
Compliance
Engineering
Production
Maintenance
Environmental
Site Operations
Technical Services
Emergency Response
Training and Development
Health and Safety Manager
Project Manager
Site Supervisor
Risk Assessment Specialist
Safety Officer
Operations Manager
Construction Manager
Compliance Officer
Quality Control Manager
Environmental Health Officer
Site Engineer
Production Manager
Maintenance Supervisor
Technical Director
HSE Coordinator
Find the exact document you need
Infection Control Risk Assessment Form For (Construction)
A regulatory compliance document used in Indian healthcare facilities to assess and manage infection control risks during construction activities, aligned with national healthcare and building standards.
Industrial Risk Assessment
A regulatory-compliant risk assessment document under Indian law that identifies, analyzes, and provides mitigation strategies for industrial hazards and risks.
Hospital Safety Risk Assessment
A comprehensive safety risk assessment document for healthcare facilities in India, evaluating various safety aspects and providing risk mitigation recommendations.
Hospital Risk Assessment
A comprehensive hospital risk assessment document compliant with Indian healthcare regulations and NABH standards, designed to identify and mitigate healthcare facility risks.
Home Working Risk Assessment
An India-compliant risk assessment document for evaluating and managing health, safety, and security risks associated with remote working arrangements.
Home Risk Assessment Form
An Indian jurisdiction document for comprehensive residential property risk assessment, compliant with national building codes and safety regulations.
Eyewash Risk Assessment Form
An Indian workplace safety document for assessing eye hazards and eyewash facilities, ensuring compliance with The Factories Act, 1948 and state regulations.
Fire Risk Assessment Review
A comprehensive evaluation of fire safety measures and risks in accordance with Indian fire safety regulations, providing detailed recommendations for compliance and improvements.
Environment Of Care Risk Assessment
An environmental risk and safety assessment document for healthcare facilities in India, ensuring compliance with national environmental and healthcare facility standards.
Contractors Risk Assessment
A regulatory-compliant risk assessment document under Indian law for evaluating and managing contractor-related hazards and safety measures in construction and development projects.
Construction Fire Risk Assessment
A mandatory fire safety evaluation document for construction projects in India, ensuring compliance with national and state-level fire safety regulations.
Care Home Fire Risk Assessment
A mandatory fire safety assessment document for Indian care homes, ensuring compliance with national and state fire safety regulations while protecting vulnerable residents.
Task Based Risk Assessment
A comprehensive safety document that identifies, evaluates, and controls task-specific workplace risks, compliant with Indian safety regulations and standards.
Site Risk Assessment
A mandatory risk assessment document under Indian law that evaluates and documents site-specific hazards, safety measures, and compliance requirements.
Job Risk Assessment Form
A standardized form for workplace hazard identification and risk assessment, compliant with Indian safety regulations and labor codes.
First Aid Needs Assessment Form
An assessment form for evaluating workplace first aid requirements and ensuring compliance with Indian safety regulations and statutory requirements.
Water Risk Assessment
A detailed evaluation of water-related risks and mitigation strategies for operations in India, complying with national and state-level water regulations.
Model Risk Assessment
A regulatory-compliant framework for assessing model risks in Indian financial institutions, following RBI guidelines and Basel III standards.
Government Risk Assessment
An Indian government-compliant risk assessment document for analyzing and evaluating operational and strategic risks in public sector operations.
Construction Risk Assessment Form
An Indian regulatory-compliant form for assessing and managing construction site risks and safety measures under Indian construction safety laws.
Building Risk Assessment
A comprehensive evaluation of building-related risks and safety measures compliant with Indian construction and safety regulations.
Area Risk Assessment
A detailed risk evaluation document compliant with Indian safety and environmental regulations, analyzing potential hazards and providing mitigation recommendations for a specified area.
Pharmacy Risk Assessment
A regulatory-compliant risk assessment framework for pharmacies in India, evaluating operational, safety, and compliance risks while providing mitigation strategies.
Organisational Risk Assessment
A comprehensive risk assessment document that evaluates organizational risks and mitigation strategies in compliance with Indian regulatory requirements.
Makeup Artist Risk Assessment
An Indian law-compliant risk assessment template for makeup artists, outlining safety protocols and hazard mitigation strategies for cosmetic application services.
Forestry Risk Assessment
A detailed risk assessment document for forest-related activities in India, analyzing environmental, social, and regulatory risks while ensuring compliance with Indian forest legislation.
Risk Assessment Childcare
A comprehensive risk assessment template for Indian childcare facilities, ensuring compliance with national safety regulations and operational standards.
Smoking Risk Assessment
A risk assessment document for managing smoking-related hazards and ensuring compliance with Indian tobacco control and workplace safety regulations.
Plant And Equipment Risk Management Form
An Indian regulatory-compliant form for comprehensive risk assessment and management of industrial plant and equipment operations.
Machine Guarding Assessment
A technical evaluation of industrial machine guarding systems' compliance and adequacy under Indian safety regulations and standards.
New And Expectant Mothers Risk Assessment
An Indian law-compliant risk assessment document for protecting pregnant employees and new mothers in the workplace, addressing various occupational hazards and necessary control measures.
Bar Risk Assessment
A comprehensive risk assessment framework for bar operations in India, incorporating state and national regulatory requirements for safety, hygiene, and alcohol service compliance.
Machine Guarding Risk Assessment
A technical safety assessment document evaluating machinery hazards and guarding requirements in accordance with Indian industrial safety regulations and the Factories Act 1948.
Field Level Hazard Assessment
A standardized safety assessment document used in Indian industrial operations to identify and mitigate workplace hazards, compliant with national safety regulations.
Home Visit Risk Assessment
An Indian jurisdiction-compliant risk assessment template for healthcare professionals conducting home visits, addressing safety, security, and healthcare delivery requirements.
Formal Hazard Assessment
A mandatory workplace hazard evaluation and risk assessment document compliant with Indian safety regulations and workplace safety laws.
Application Security Risk Assessment
An Indian law-governed agreement for conducting application security risk assessments, outlining testing scope, methodology, and compliance requirements.
Workstation Risk Assessment Form
A comprehensive workstation risk assessment tool compliant with Indian workplace safety regulations, designed to evaluate and document computer workstation safety and ergonomic conditions.
Financial Institution Risk Assessment
A comprehensive risk assessment framework for Indian financial institutions, aligned with RBI regulations and Basel guidelines, evaluating multiple risk categories and providing mitigation strategies.
General Risk Assessment Form
A standardized risk assessment document for identifying and managing workplace hazards in compliance with Indian safety regulations.
Project Risk Assessment
A comprehensive risk assessment and mitigation planning document compliant with Indian regulatory requirements, designed to identify and address project-related risks.
Risk Assessment And Management Plan
A comprehensive risk management framework document compliant with Indian regulations, outlining risk assessment, mitigation strategies, and monitoring procedures.
High Level Risk Assessment
A comprehensive risk evaluation document compliant with Indian regulatory requirements, providing systematic assessment and mitigation strategies for organizational risks.
Hazard Identification Form
A standardized form for identifying and documenting workplace hazards in compliance with Indian safety regulations and workplace safety requirements.
Occupied Building Risk Assessment
A comprehensive risk assessment document for occupied buildings in India, evaluating safety, structural, and operational risks under Indian regulatory requirements.
Care Home Risk Assessment
A structured risk assessment document for Indian care homes, ensuring compliance with national healthcare regulations while evaluating and managing facility-wide safety risks.
Workplace Assessment
A comprehensive workplace safety and compliance evaluation document aligned with Indian regulations, assessing various aspects of workplace conditions and providing improvement recommendations.
Factory Risk Assessment
A mandatory risk evaluation document under Indian law that identifies, assesses, and provides mitigation strategies for all potential hazards in factory operations.
Display Screen Assessment
An Indian regulation-compliant assessment document for evaluating workplace display screen equipment setup and associated health and safety factors.
Asset Management Risk Assessment
An Indian law-governed document establishing risk assessment framework for asset management activities, ensuring compliance with SEBI and RBI regulations.
Daily Risk Assessment
A comprehensive daily workplace safety assessment tool compliant with Indian safety regulations, used to identify, evaluate, and control workplace hazards.
Catering Risk Assessment
An India-compliant risk assessment document for catering operations, addressing food safety, operational hazards, and control measures under FSSAI regulations.
Working At Height Risk Assessment
An Indian regulation-compliant risk assessment document for managing safety risks associated with working at height activities, aligned with the Factories Act and construction safety requirements.
Hazard Vulnerability Assessment
A comprehensive hazard and vulnerability evaluation document compliant with Indian regulations, assessing potential risks and providing mitigation recommendations.
Manual Handling Risk Assessment
An Indian regulation-compliant risk assessment document for evaluating and controlling manual handling hazards in workplace operations.
Risk Management Assessment
A comprehensive risk evaluation document compliant with Indian regulations that identifies, analyzes, and provides mitigation strategies for organizational risks.
Office Risk Assessment
A mandatory workplace safety assessment document under Indian law that identifies and addresses office-related risks and hazards while ensuring regulatory compliance.
Window Cleaning Risk Assessment
An Indian jurisdiction-compliant risk assessment document for window cleaning operations, detailing safety protocols and hazard mitigation strategies.
Food Risk Assessment
A technical assessment document identifying food safety hazards and control measures in compliance with Indian FSSAI regulations and food safety standards.
Occupational Therapy Risk Assessment
An Indian regulation-compliant occupational therapy risk assessment document for evaluating and documenting potential hazards and therapeutic adaptations in various environments.
Psychology Risk Assessment
A legally compliant psychological risk evaluation document used in India for assessing and managing mental health risks.
Food Defence Risk Assessment
A comprehensive food defence risk assessment document compliant with Indian FSSAI regulations, evaluating and establishing protocols to prevent intentional food contamination.
Food Fraud Vulnerability Assessment
A comprehensive food fraud vulnerability assessment framework compliant with Indian FSSAI requirements and international standards.
Workplace Violence Risk Assessment
A systematic evaluation of workplace violence risks and mitigation strategies, compliant with Indian safety regulations and labor laws.
Warehouse Risk Assessment
A detailed risk assessment document for warehouse operations in India, evaluating safety, compliance, and operational hazards while providing mitigation recommendations.
Third Party Risk Assessment
A regulatory-compliant framework for assessing third-party risks in India, incorporating local legal requirements and international risk management standards.
Travel Risk Assessment
An India-compliant risk assessment document analyzing travel-related risks and providing mitigation strategies under Indian law.
Stress Risk Assessment
A legally compliant workplace stress risk assessment document adhering to Indian labor laws and safety regulations, designed to identify and mitigate psychological hazards in the workplace.
Step Ladder Risk Assessment
An Indian workplace safety document for assessing and controlling risks associated with step ladder use, compliant with national safety regulations.
Shop Risk Assessment
A mandatory safety evaluation document for retail establishments in India, assessing workplace hazards and risk control measures in compliance with national and state safety regulations.
Risk Assessment Form
A structured document for identifying and managing workplace risks and hazards, compliant with Indian safety regulations and standards.
Risk Assessment And Method Statement
A comprehensive safety management document combining risk assessment and work procedures, designed to comply with Indian safety regulations and labor laws.
Pest Risk Assessment
A regulatory document under Indian law that assesses potential risks associated with pest species and recommends appropriate management strategies.
Infection Control Risk Assessment
A comprehensive infection control risk assessment framework for healthcare facilities in India, aligned with NABH standards and national healthcare regulations.
Legal Risk Assessment
A comprehensive legal risk evaluation and mitigation strategy document prepared under Indian law, analyzing potential legal exposures and compliance requirements.
Functional Risk Assessment
A comprehensive operational risk evaluation document compliant with Indian safety and workplace regulations, designed to identify and mitigate organizational risks.
Forklift Risk Assessment
A regulatory-compliant risk assessment document for forklift operations under Indian law, identifying hazards and establishing safety protocols.
Food Safety Risk Assessment
A systematic evaluation of food safety hazards and risks compliant with Indian FSSAI regulations and food safety standards.
First Aid Risk Assessment
A mandatory workplace safety document under Indian regulations that assesses first aid requirements and emergency response procedures based on workplace-specific risks.
Finance Risk Assessment
A comprehensive financial risk evaluation document compliant with Indian regulatory requirements and RBI/SEBI guidelines.
Exposure Assessment
A technical document compliant with Indian regulations that evaluates and documents workplace exposure risks, providing analysis and control recommendations.
Anti Bribery And Corruption Risk Assessment
A comprehensive anti-bribery and corruption risk assessment document aligned with Indian regulatory requirements and international standards.
Client Risk Assessment Form
An Indian regulatory-compliant form for assessing and documenting client risk profiles in financial institutions, aligned with RBI and SEBI guidelines.
Epilepsy Risk Assessment Form
An Indian-compliant medical form for assessing and documenting epilepsy-related risks, safety protocols, and management strategies.
Young Person Risk Assessment Form
An Indian jurisdiction risk assessment form for evaluating and documenting potential risks to young persons (under 18) in various activities and work environments.
Automatic Gate Risk Assessment Form
An Indian-compliant risk assessment form for evaluating safety and operational aspects of automatic gate systems under Indian safety regulations.
Life Safety Risk Assessment Form
A comprehensive safety evaluation document used in India to assess and document life safety risks in facilities, ensuring compliance with national and state safety regulations.
Vendor Risk Assessment Form
A comprehensive vendor risk assessment tool compliant with Indian regulations for evaluating supplier-related risks across multiple dimensions.
Risk Assessment And Control Form
A legally compliant document under Indian law for identifying, assessing, and controlling workplace hazards and risks.
Respiratory Hazard Assessment Form
An Indian regulatory-compliant assessment form for evaluating and controlling workplace respiratory hazards under the Factories Act framework.
Workplace Hazard Assessment Form
A mandatory workplace safety assessment document under Indian law for identifying and managing workplace hazards, aligned with the OSH Code 2020.
Biological Risk Assessment Form
An Indian regulatory-compliant form for assessing and documenting biological hazards and risks in laboratory and research settings, including control measures and safety protocols.
Fire Risk Assessment Form
An Indian regulation-compliant fire risk assessment document for evaluating and documenting fire safety measures, hazards, and improvement requirements in properties.
Site Safety Assessment Form
An Indian regulatory-compliant form for conducting and documenting comprehensive site safety assessments and risk evaluations.
Hazard Identification And Risk Assessment Form
An Indian regulatory-compliant document for systematic workplace hazard identification and risk assessment, meeting requirements under the Factories Act and OSH Code.
Plant Risk Assessment Form
A regulatory-compliant form used in India for assessing and documenting risks associated with industrial plant and machinery operations.
Operational Risk Management Form
A comprehensive operational risk management framework document designed for organizations operating in India, ensuring compliance with local regulatory requirements while following international best practices.
Health Hazard Evaluation Form
A comprehensive workplace health hazard assessment and documentation tool compliant with Indian safety regulations and guidelines.
Environmental Risk Assessment Form
A mandatory technical document under Indian law for assessing and managing environmental risks associated with industrial and development projects.
Cyber Security Assessment Form
A structured cybersecurity assessment document aligned with Indian regulatory requirements, designed to evaluate and document an organization's security posture and compliance status.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.