Subcontract Agreement For Construction Work
1. Parties: Identification of the main contractor and subcontractor, including company registration numbers and authorized representatives
2. Background: Context of the main construction project and the relationship to the main contract
3. Definitions: Key terms used throughout the agreement, including project-specific terminology
4. Scope of Work: Detailed description of the subcontractor's responsibilities and deliverables
5. Contract Documents: Hierarchy and list of documents forming part of the agreement
6. Time Schedule: Project timeline, milestones, and completion dates
7. Price and Payment: Payment terms, rates, variations, and invoicing procedures
8. Quality Requirements: Standards, specifications, and quality assurance procedures
9. Materials and Equipment: Responsibilities for supply and maintenance of materials and equipment
10. Health and Safety: Safety requirements and responsibilities aligned with Danish Working Environment Act
11. Supervision and Coordination: Requirements for site supervision and coordination with other contractors
12. Testing and Handover: Inspection procedures, testing requirements, and handover process
13. Defects and Warranties: Warranty periods, remedy of defects, and maintenance obligations
14. Insurance and Liability: Required insurance coverage and allocation of risks
15. Termination: Grounds and procedures for contract termination
16. Dispute Resolution: Procedures for handling disputes in accordance with Danish law
17. Governing Law: Confirmation of Danish law as governing law and jurisdiction
1. Environmental Requirements: Specific environmental obligations and sustainability requirements, included when project has particular environmental focus
2. Design Responsibilities: Included when subcontractor has design obligations in addition to construction work
3. Performance Security: Requirements for performance bonds or guarantees, included for higher-value contracts
4. Intellectual Property Rights: Included when subcontractor's work involves design or innovative solutions
5. Confidentiality: Detailed confidentiality obligations, included for sensitive projects
6. Force Majeure: Specific force majeure provisions beyond standard AB 18 terms
7. Special Working Conditions: Included when work involves unusual circumstances or specific site conditions
8. Building Information Modeling (BIM): Included when project requires BIM implementation
1. Schedule 1: Scope of Works: Detailed technical specifications and drawings
2. Schedule 2: Bill of Quantities: Itemized list of quantities and rates
3. Schedule 3: Project Timeline: Detailed program of works including milestones
4. Schedule 4: Quality Assurance Plan: Specific quality control procedures and requirements
5. Schedule 5: Health and Safety Plan: Detailed safety procedures and risk assessments
6. Schedule 6: Payment Schedule: Detailed payment terms, milestone payments, and retention amounts
7. Schedule 7: Key Personnel: List of key personnel and their qualifications
8. Schedule 8: Form of Collateral Warranty: Standard form of warranty to be provided
9. Appendix A: Main Contract Excerpts: Relevant excerpts from the main construction contract
10. Appendix B: Technical Drawings: Complete set of relevant technical drawings
11. Appendix C: Insurance Certificates: Copies of required insurance policies
Authors
Main Contract
Main Contractor
Subcontractor
Project
Works
Site
Project Owner
Contract Documents
Contract Sum
Day
Working Day
Practical Completion
Completion Date
Defects
Defects Liability Period
Variations
Force Majeure
Materials
Plant and Equipment
Programme of Works
Quality Assurance Plan
Health and Safety Plan
Technical Specifications
Drawings
Building Regulations
Applicable Laws
AB 18
AB-U 18
Project Manager
Site Manager
Supervisory Staff
Milestone Dates
Payment Certificate
Retention Money
Performance Security
Insurance Requirements
Method Statement
Risk Register
Construction Period
Testing Period
Handover
As-Built Documents
Substantial Completion
Final Completion
Progress Reports
Virtual Construction Model
Construction Schedule
Bill of Quantities
Rate
Unit Price
Intellectual Property Rights
Confidential Information
Scope of Work
Contract Documents
Contractor Obligations
Subcontractor Obligations
Time and Programme
Extensions of Time
Payment
Variations
Quality Assurance
Materials and Workmanship
Health and Safety
Environmental Protection
Site Management
Testing and Inspection
Completion and Handover
Defects Liability
Insurance
Indemnification
Performance Security
Intellectual Property
Confidentiality
Force Majeure
Suspension
Termination
Dispute Resolution
Governing Law
Assignment and Subcontracting
Notices
Warranties
Liability
Risk Allocation
Coordination
Documentation
Compliance with Laws
Personnel
Equipment
Site Access
Progress Reporting
Record Keeping
Find the exact document you need
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.