Scaffold Risk Assessment And Method Statement
"I need a Scaffold Risk Assessment and Method Statement for a 4-story commercial building renovation project in Auckland CBD, starting March 2025, where scaffolding will be erected along the building's exterior for facade maintenance work."
1. Project Information: Details of the project including site address, client details, scope of scaffolding work, and project duration
2. Responsible Persons: List of key personnel including project manager, site supervisor, scaffolding supervisor, and safety officer with their contact details and responsibilities
3. Site Description: Detailed description of the work site, access points, ground conditions, and surrounding environment
4. Risk Assessment: Comprehensive assessment of all potential hazards, risk levels, and existing control measures
5. Control Measures: Detailed description of safety measures implemented to mitigate identified risks
6. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling
7. Emergency Procedures: Emergency response plans, evacuation procedures, and emergency contact information
8. Equipment Requirements: List of required scaffolding equipment, tools, and PPE with specifications
9. Training Requirements: Required qualifications, certifications, and training for workers involved
10. Monitoring and Review: Procedures for regular inspections, maintenance, and documentation requirements
1. Environmental Management: Environmental protection measures when working in sensitive areas or adverse weather conditions
2. Traffic Management: Required for sites where scaffolding work affects public roads or pedestrian access
3. Noise Management: When scaffolding work is conducted in noise-sensitive areas or during restricted hours
4. Public Protection: Additional measures required when working in public areas or near occupied buildings
5. Special Access Requirements: For projects requiring unusual access methods or equipment
6. Temporary Works: When additional temporary structures or supports are required
1. Schedule A - Site Layout Plan: Detailed site plans showing scaffold locations, access points, and safety zones
2. Schedule B - Risk Assessment Matrix: Detailed risk assessment scores and methodology
3. Schedule C - Equipment Specifications: Technical specifications for all scaffolding components and equipment
4. Schedule D - Inspection Checklist: Daily and weekly scaffold inspection forms
5. Schedule E - Training Records: Copies of relevant training certificates and competency records
6. Schedule F - Emergency Contact List: Comprehensive list of emergency contacts and procedures
7. Appendix 1 - Technical Drawings: Detailed scaffold design drawings and calculations
8. Appendix 2 - Manufacturers' Guidelines: Relevant equipment manufacturer specifications and guidelines
9. Appendix 3 - Permits: Copies of relevant work permits and authorizations
10. Appendix 4 - Safety Data Sheets: SDS for any hazardous materials used in the scaffolding process
Authors
Competent Person
Scaffold
Working Platform
Guardrail
Toe Board
Base Plate
Sole Plate
Tie
Bracing
Live Load
Dead Load
Maximum Rated Load
Duty Loading
Access Platform
Landing
Bay Length
Ledger
Standard
Transom
Risk Assessment
Hazard
Control Measure
Method Statement
PPE
Fall Protection
Safe Working Load (SWL)
Notifiable Work
Tag System
Scaffold Register
Handover Certificate
Design Verification
Work at Height
Edge Protection
Site Supervisor
Scaffolding Contractor
Principal Contractor
Emergency Procedures
Safety Harness
Anchor Point
Designated Working Area
Exclusion Zone
Inspection Protocol
Scaffold Classification
Light Duty
Medium Duty
Heavy Duty
Special Duty
Mobile Scaffold
Static Scaffold
Suspended Scaffold
Responsible Parties
Site Access
Risk Assessment
Control Measures
Work Methodology
Equipment Requirements
Safety Procedures
Emergency Response
Training Requirements
Inspection Requirements
Documentation Requirements
Compliance
Environmental Protection
Public Safety
Traffic Management
Incident Reporting
Quality Control
Communication Protocols
Review and Monitoring
Construction
Infrastructure
Commercial Property
Industrial
Residential Construction
Mining
Oil and Gas
Telecommunications
Utilities
Maritime
Energy
Health and Safety
Operations
Project Management
Site Operations
Quality Assurance
Compliance
Risk Management
Construction Management
Contract Administration
Technical Services
Health and Safety Manager
Project Manager
Site Supervisor
Scaffolding Supervisor
Construction Manager
Safety Officer
Risk Assessment Officer
Compliance Manager
Operations Manager
Site Engineer
Works Coordinator
Quality Control Inspector
Contract Administrator
Principal Contractor
Building Inspector
Find the exact document you need
Scaffold Risk Assessment And Method Statement
A New Zealand-compliant safety and methodology document for scaffolding works, combining risk assessment and detailed work procedures under NZ health and safety legislation.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.