Power Purchase Agreement Energy Storage Template for United Arab Emirates

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Power Purchase Agreement Energy Storage

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Power Purchase Agreement Energy Storage

"I need a Power Purchase Agreement Energy Storage for a new 50MW lithium-ion battery storage facility in Dubai, UAE, with commercial operations starting March 2025, including specific provisions for grid frequency regulation services and peak load management."

Document background
The Power Purchase Agreement Energy Storage template is designed for use in the United Arab Emirates, specifically tailored to the country's evolving energy landscape and regulatory framework. This document is essential when establishing long-term contractual relationships for energy storage services, typically used between facility owners/operators and power purchasers such as utility companies. The agreement encompasses crucial elements including technical specifications, operational parameters, performance requirements, payment structures, and regulatory compliance measures. It aligns with the UAE's Energy Strategy 2050 and relevant federal and emirate-level energy regulations, making it particularly relevant for projects contributing to grid stability and clean energy integration. The document addresses both traditional and emerging storage technologies, incorporating flexibility for technological advancement while maintaining compliance with UAE legal requirements.
Suggested Sections

1. Parties: Identification of the contracting parties including the facility owner/operator and the power purchaser

2. Background: Context of the agreement, including project overview and relevant regulatory framework

3. Definitions: Detailed definitions of technical and commercial terms used throughout the agreement

4. Term and Conditions Precedent: Duration of the agreement and conditions that must be satisfied before the agreement becomes effective

5. Storage Facility Specifications: Technical specifications of the energy storage facility including capacity, response time, and operational parameters

6. Operating Procedures: Detailed procedures for charging, discharging, maintenance, and emergency operations

7. Performance Requirements: Specific performance metrics, availability requirements, and response times

8. Dispatch and Scheduling: Procedures for scheduling storage services and dispatch instructions

9. Metering and Testing: Requirements for measuring stored energy, delivered energy, and facility performance testing

10. Payment Provisions: Payment structure, rates, and calculations for storage services

11. Force Majeure: Events constituting force majeure and their consequences

12. Liability and Indemnification: Allocation of risks and responsibilities between parties

13. Insurance: Required insurance coverage for the facility and operations

14. Default and Termination: Events of default, cure periods, and termination rights

15. Dispute Resolution: Procedures for resolving disputes, including reference to UAE courts or arbitration

Optional Sections

1. Construction and Commissioning: Required if the storage facility is not yet built, covering construction milestones and commissioning procedures

2. Grid Connection: Required if new grid connections need to be established, detailing connection requirements and responsibilities

3. Environmental Credits: Include if the project generates environmental attributes or clean energy certificates

4. Technology Upgrade Provisions: Include for long-term agreements where technology updates may be necessary

5. Local Content Requirements: Include if there are UAE local content requirements applicable to the project

6. Refinancing Provisions: Include if project financing arrangements may need to be modified during the term

7. Interface with Other Facilities: Required if the storage facility interfaces with other power generation or transmission facilities

Suggested Schedules

1. Technical Specifications: Detailed technical parameters of the storage facility including capacity, efficiency, and response characteristics

2. Operating Procedures Manual: Detailed procedures for daily operation, maintenance, and emergency response

3. Testing Procedures: Procedures for conducting performance tests and measuring compliance

4. Payment Calculations: Detailed formulas and examples for calculating payments

5. Form of Performance Security: Template for performance bonds or other security instruments

6. Interconnection Requirements: Technical requirements for grid connection and interface

7. Environmental and Safety Requirements: Environmental compliance requirements and safety procedures

8. Communication Protocols: Procedures for operational communications and notifications

9. Permitted Planned Outage Schedule: Schedule of allowed maintenance periods and procedures

10. Key Performance Indicators: Detailed metrics for measuring facility performance and availability

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions
Clauses
Relevant Industries

Energy & Utilities

Renewable Energy

Infrastructure

Power Generation

Clean Technology

Grid Services

Energy Trading

Project Finance

Construction & Engineering

Relevant Teams

Legal

Commercial

Operations

Technical

Regulatory Affairs

Finance

Risk Management

Business Development

Engineering

Procurement

Project Management

Energy Trading

Compliance

Asset Management

Relevant Roles

Energy Storage Project Manager

Power Plant Manager

Commercial Director

Legal Counsel

Energy Trading Manager

Grid Operations Manager

Technical Director

Regulatory Compliance Officer

Business Development Manager

Contract Manager

Chief Technical Officer

Energy Storage Engineer

Risk Manager

Finance Director

Operations Manager

Industries
Federal Law No. 2 of 2014: Main federal legislation regulating small-scale power generation and water desalination in the UAE, providing the framework for power generation and distribution
UAE Energy Strategy 2050: National strategy document setting targets for clean energy integration and energy storage development, crucial for understanding regulatory context and future requirements
Federal Law No. 24 of 1999: Environmental Protection and Development Law, relevant for environmental compliance aspects of energy storage facilities
UAE Civil Code (Federal Law No. 5 of 1985): Governs contractual relationships and obligations, providing the basic framework for commercial contracts including PPAs
UAE Commercial Transactions Law (Federal Law No. 18 of 1993): Regulates commercial transactions and provides framework for business relationships and commercial contracts
Electricity and Water Supply Regulations: Various emirate-level regulations governing power supply, grid connection, and utility operations
DEWA/ADWEA/SEWA Standards: Technical standards and requirements set by respective emirate utility authorities for grid connection and energy storage systems
UAE Cabinet Resolution No. 31 of 2021: Regulations concerning clean energy certificates, relevant for renewable energy storage and trading
Federal Law No. 19 of 2018: Foreign Direct Investment Law, relevant if the energy storage project involves foreign investment or ownership
UAE Competition Law (Federal Law No. 4 of 2012): Relevant for market competition aspects and pricing mechanisms in power purchase agreements
Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Corporate Solar PPA

UAE-compliant agreement for corporate procurement of solar power, structured under UAE federal and emirate-specific energy regulations.

find out more

Green Power Purchase Agreement

UAE-governed agreement for the sale and purchase of renewable energy, including pricing, delivery terms, and regulatory compliance requirements.

find out more

Virtual Power Purchase Agreement

UAE-compliant Virtual Power Purchase Agreement template for renewable energy procurement through financial settlements.

find out more

Power Purchase Agreement Energy Storage

UAE-governed agreement for energy storage services between facility operators and power purchasers, including technical, operational, and commercial terms.

find out more

Contract For Differences PPA

A UAE-governed agreement establishing a contract-for-differences mechanism for power purchase, ensuring price stability between generators and offtakers while complying with UAE energy regulations.

find out more

Commercial Solar Power Purchase Agreement

UAE-governed agreement for the sale and purchase of solar-generated electricity between a provider and commercial customer, including installation and operational terms.

find out more

Power Purchase Contract

UAE-governed agreement for the sale and purchase of electrical power between a generator and offtaker, incorporating local regulatory requirements.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: https://www.genieai.co/our-research
Oops! Something went wrong while submitting the form.

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our Trust Centre for more details and real-time security updates.